Evidence Guide: TLIC4073 - Set up, operate and shut down a distributed power system

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIC4073 - Set up, operate and shut down a distributed power system

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare train for set up of distributed power system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Distributed motive power units are positioned as required in train consist

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and risk control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Train sections are marshalled to form one train as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up remote distributed motive power units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Distributed power is set up on all remote units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Distributed power system is tested in accordance with manufacturer instructions and/or organisational policies and procedures ready for linking with lead control unit

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Startup procedures for remote distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up lead distributed motive power units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Distributed power system is set up by conditioning/activation of required systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Distributed power system is tested in accordance with manufacturer instructions and/or organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Startup procedures for lead distributed motive power unit are followed in accordance with manufacturer instructions and/or organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Full control of distributed motive power units is established after linking process has been completed and required function tests have been conducted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate and monitor distributed power train

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Distributed power system is operated and monitored during train operation to ensure safe train handling and control in accordance with operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational difficulties/faults are identified and rectified ensuring operational safety and efficiency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shutdown procedures for distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down distributed power systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Distributed power train is secured against movement as required prior to system shut down

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare train for set up of distributed power system

1.1

Distributed motive power units are positioned as required in train consist

1.2

Hazards are identified, risks are assessed and risk control measures are implemented

1.3

Train sections are marshalled to form one train as required

2

Set up remote distributed motive power units

2.1

Distributed power is set up on all remote units

2.2

Distributed power system is tested in accordance with manufacturer instructions and/or organisational policies and procedures ready for linking with lead control unit

2.3

Startup procedures for remote distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

3

Set up lead distributed motive power units

3.1

Distributed power system is set up by conditioning/activation of required systems

3.2

Distributed power system is tested in accordance with manufacturer instructions and/or organisational policies and procedures

3.3

Startup procedures for lead distributed motive power unit are followed in accordance with manufacturer instructions and/or organisational policies and procedures

3.4

Full control of distributed motive power units is established after linking process has been completed and required function tests have been conducted

4

Operate and monitor distributed power train

4.1

Distributed power system is operated and monitored during train operation to ensure safe train handling and control in accordance with operational requirements

4.2

Operational difficulties/faults are identified and rectified ensuring operational safety and efficiency

4.3

Shutdown procedures for distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

5

Shut down distributed power systems

5.1

Distributed power train is secured against movement as required prior to system shut down

5.2

Shutdown procedures for distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare train for set up of distributed power system

1.1

Distributed motive power units are positioned as required in train consist

1.2

Hazards are identified, risks are assessed and risk control measures are implemented

1.3

Train sections are marshalled to form one train as required

2

Set up remote distributed motive power units

2.1

Distributed power is set up on all remote units

2.2

Distributed power system is tested in accordance with manufacturer instructions and/or organisational policies and procedures ready for linking with lead control unit

2.3

Startup procedures for remote distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

3

Set up lead distributed motive power units

3.1

Distributed power system is set up by conditioning/activation of required systems

3.2

Distributed power system is tested in accordance with manufacturer instructions and/or organisational policies and procedures

3.3

Startup procedures for lead distributed motive power unit are followed in accordance with manufacturer instructions and/or organisational policies and procedures

3.4

Full control of distributed motive power units is established after linking process has been completed and required function tests have been conducted

4

Operate and monitor distributed power train

4.1

Distributed power system is operated and monitored during train operation to ensure safe train handling and control in accordance with operational requirements

4.2

Operational difficulties/faults are identified and rectified ensuring operational safety and efficiency

4.3

Shutdown procedures for distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

5

Shut down distributed power systems

5.1

Distributed power train is secured against movement as required prior to system shut down

5.2

Shutdown procedures for distributed motive power units are followed in accordance with manufacturer instructions and/or organisational policies and procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

monitoring equipment performance

operating and adapting to differences in equipment in accordance with operating procedures

reading and interpreting relevant instructions, procedures, information and signs

reporting and/or rectifying identified problems, faults or malfunctions promptly, in accordance with regulatory requirements and organisational procedures

setting up, operating and shutting down a distributed power system.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

controls, instruments and indicators of a distributed power system and their purpose, location and use

critical distributed power system control information including compatible coupling, braking, drive equipment and ancillary systems

manufacturer instructions for distributed power units

procedures for identifying equipment defects in distributed power system and assessing identified defective units for appropriate action

procedures for managing hazardous situations involving distributed power system

relevant distributed power system documents

relevant applicable state/territory legislated rail safety requirements, codes of practice and/or guidelines

relevant work health and safety (WHS)/occupational health and safety (OHS) legislation, regulations, codes, policies and procedures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.