The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Operate mobile crane
|
|
In ascent and descent to/from crane correct use is made of the means provided in accordance with codes of practice and workplace procedures Completed |
Evidence:
|
Planned hazard control strategies are implemented Completed |
Evidence:
|
Required signals are correctly given, interpreted and followed in accordance with appropriate Australian standards Completed |
Evidence:
|
Boom is positioned to ensure load to be lifted is plumbed under hook Completed |
Evidence:
|
Load is hoisted and lowered into position using crane movements in accordance with the appropriate Australian standard Completed |
Evidence:
|
Crane controls are operated smoothly Completed |
Evidence:
|
Where necessary, crane is mobiled according to manufacturers specifications, appropriate Australian standards, workplace procedures Completed |
Evidence:
|
Crane is shut down and secured during periods of non-operation according to manufacturers specifications and workplace procedures Completed |
Evidence:
|
Monitor lift conditions
|
|
Load is constantly monitored to ensure load and structural stability Completed |
Evidence:
|
Conditions which may affect the continuing stability of the crane are identified and monitored Completed |
Evidence:
|
Unplanned situations are responded to in line with workplace procedures in a manner that minimises risk to personnel and equipment Completed |
Evidence:
|
Dogger is advised of any new information which affects the lift Completed |
Evidence:
|
Any necessary changes to job plan are discussed and confirmed with rest of crew Completed |
Evidence:
|
Advice is sought from supervisor where there is doubt about correct response to unanticipated conditions, or conflict with customer request Completed |
Evidence:
|
Supervisor/allocator is advised of any concern about completing the job within timeframe Completed |
Evidence:
|
Implement shut-down procedures
|
|
The relevant motion locks and brakes are applied Completed |
Evidence:
|
Crane is shut down using the correct sequence of procedures in accordance with manufacturers specifications and workplace procedures Completed |
Evidence:
|
Routine post-operational equipment checks are carried out in accordance with manufacturers specifications Completed |
Evidence:
|
Pack up crane
|
|
Crane is de-rigged with other crane personnel in accordance with manufacturers instructions Completed |
Evidence:
|
All lifting equipment and crane components are checked in consultation with crane personnel for any signs of deterioration or damage in accordance with the appropriate Australian standard Completed |
Evidence:
|
Damaged or worn equipment is segregated and reported to an authorised person for testing/repair/destruction Completed |
Evidence:
|
Crane and equipment are correctly stowed and secured in accordance with manufacturers instructions and the appropriate Australian standard Completed |
Evidence:
|
Complete job records
|
|
Customer feedback is sought regarding satisfaction with the completed job, and any areas of concern are reported according to workplace procedures Completed |
Evidence:
|
Customer's signature on job completion documentation is obtained Completed |
Evidence:
|
Required workplace records are updated accurately and promptly and processed according to workplace procedures Completed |
Evidence:
|