NTISthis.com

Evidence Guide: TLID4050 - Discharge a dangerous goods tanker

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLID4050 - Discharge a dangerous goods tanker

What evidence can you provide to prove your understanding of each of the following citeria?

Conduct pre-discharge activities

  1. Delivery location is checked against site plan and delivery job sheet
  2. Job hazards are identified and required action is taken to minimise, control or eliminate identified hazards
  3. Tanker is positioned to enable discharging to be carried out in accordance with site procedures without injury to people or damage to property
  4. Park brake is applied, engine turned is off and battery is isolated, as required
  5. Personal protective equipment is used in accordance with site and organisational procedures
  6. Site authority to proceed is obtained, as required, and followed in accordance with site organisational procedures
Delivery location is checked against site plan and delivery job sheet

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job hazards are identified and required action is taken to minimise, control or eliminate identified hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tanker is positioned to enable discharging to be carried out in accordance with site procedures without injury to people or damage to property

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Park brake is applied, engine turned is off and battery is isolated, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personal protective equipment is used in accordance with site and organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site authority to proceed is obtained, as required, and followed in accordance with site organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for discharging

  1. Delivery location is checked for hazards and set up, in accordance with regulatory requirements and organisational procedures
  2. Lids on spillbox are lifted and spillbox is drained of liquid
  3. Identification (ID) markers and tumblers are checked against safe discharge unload plan to verify load will fit, as required
  4. Hoses are removed from tanker and test date is checked
Delivery location is checked for hazards and set up, in accordance with regulatory requirements and organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lids on spillbox are lifted and spillbox is drained of liquid

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identification (ID) markers and tumblers are checked against safe discharge unload plan to verify load will fit, as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hoses are removed from tanker and test date is checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow discharge requirements and procedures

  1. Site product type, quantity and discharged quantity are checked to determine whether receiving vessel can accept to load, and discrepancies are rectified in accordance with organisational procedures
  2. Locations of emergency equipment and emergency procedures are identified before discharging commences
  3. Product transfer equipment is connected in accordance with regulatory and organisational requirements
  4. Internal valve is opened
  5. Checks are completed prior to commencing discharge, in accordance with organisational procedures
  6. Valve is fully opened and product is discharged safely, in accordance with regulatory and organisational requirements and site procedures
  7. Discharging process is monitored in accordance with regulatory requirements, and company and site procedures
  8. Tanks and compartments are changed in accordance with regulatory and organisational requirements and site procedures
Site product type, quantity and discharged quantity are checked to determine whether receiving vessel can accept to load, and discrepancies are rectified in accordance with organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locations of emergency equipment and emergency procedures are identified before discharging commences

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Product transfer equipment is connected in accordance with regulatory and organisational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Internal valve is opened

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Checks are completed prior to commencing discharge, in accordance with organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Valve is fully opened and product is discharged safely, in accordance with regulatory and organisational requirements and site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discharging process is monitored in accordance with regulatory requirements, and company and site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tanks and compartments are changed in accordance with regulatory and organisational requirements and site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work at heights on a dangerous tanker

  1. Safety equipment is connected to tanker prior to ascending tanker ladders, as required, in accordance with safety regulations and site procedures
  2. Safety equipment is connected when operating on top of tanker, as required, in accordance with site and safety regulations
  3. Work is completed in accordance with regulatory and organisational requirements and site procedures
Safety equipment is connected to tanker prior to ascending tanker ladders, as required, in accordance with safety regulations and site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety equipment is connected when operating on top of tanker, as required, in accordance with site and safety regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is completed in accordance with regulatory and organisational requirements and site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish unloading

  1. All valves on tanker and receiving facility are closed and transfer equipment is secured in accordance with site procedures
  2. Site is re-dipped and readings are recorded on delivery documentation
  3. Site is restored to a clean and tidy condition in accordance with site procedures and site defects are reported
  4. Final safety inspection of tanker and site is conducted
  5. Tanker is moved from unloading area without damage to property or injury to people and in accordance with site procedures
  6. Delivery documentation is completed, checked and adjusted, and secured in tanker in accordance with regulatory and organisational requirements at completion of discharge
  7. Truck and tanker are checked to ensure correct placarding before departure
  8. Site plan is followed for exiting site
All valves on tanker and receiving facility are closed and transfer equipment is secured in accordance with site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is re-dipped and readings are recorded on delivery documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is restored to a clean and tidy condition in accordance with site procedures and site defects are reported

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final safety inspection of tanker and site is conducted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tanker is moved from unloading area without damage to property or injury to people and in accordance with site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Delivery documentation is completed, checked and adjusted, and secured in tanker in accordance with regulatory and organisational requirements at completion of discharge

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Truck and tanker are checked to ensure correct placarding before departure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site plan is followed for exiting site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Conduct pre-discharge activities

1.1

Delivery location is checked against site plan and delivery job sheet

1.2

Job hazards are identified and required action is taken to minimise, control or eliminate identified hazards

1.3

Tanker is positioned to enable discharging to be carried out in accordance with site procedures without injury to people or damage to property

1.4

Park brake is applied, engine turned is off and battery is isolated, as required

1.5

Personal protective equipment is used in accordance with site and organisational procedures

1.6

Site authority to proceed is obtained, as required, and followed in accordance with site organisational procedures

2

Prepare for discharging

2.1

Delivery location is checked for hazards and set up, in accordance with regulatory requirements and organisational procedures

2.2

Lids on spillbox are lifted and spillbox is drained of liquid

2.3

Identification (ID) markers and tumblers are checked against safe discharge unload plan to verify load will fit, as required

2.4

Hoses are removed from tanker and test date is checked

3

Follow discharge requirements and procedures

3.1

Site product type, quantity and discharged quantity are checked to determine whether receiving vessel can accept to load, and discrepancies are rectified in accordance with organisational procedures

3.2

Locations of emergency equipment and emergency procedures are identified before discharging commences

3.3

Product transfer equipment is connected in accordance with regulatory and organisational requirements

3.4

Internal valve is opened

3.5

Checks are completed prior to commencing discharge, in accordance with organisational procedures

3.6

Valve is fully opened and product is discharged safely, in accordance with regulatory and organisational requirements and site procedures

3.7

Discharging process is monitored in accordance with regulatory requirements, and company and site procedures

3.8

Tanks and compartments are changed in accordance with regulatory and organisational requirements and site procedures

4

Work at heights on a dangerous tanker

4.1

Safety equipment is connected to tanker prior to ascending tanker ladders, as required, in accordance with safety regulations and site procedures

4.2

Safety equipment is connected when operating on top of tanker, as required, in accordance with site and safety regulations

4.3

Work is completed in accordance with regulatory and organisational requirements and site procedures

5

Finish unloading

5.1

All valves on tanker and receiving facility are closed and transfer equipment is secured in accordance with site procedures

5.2

Site is re-dipped and readings are recorded on delivery documentation

5.3

Site is restored to a clean and tidy condition in accordance with site procedures and site defects are reported

5.4

Final safety inspection of tanker and site is conducted

5.5

Tanker is moved from unloading area without damage to property or injury to people and in accordance with site procedures

5.6

Delivery documentation is completed, checked and adjusted, and secured in tanker in accordance with regulatory and organisational requirements at completion of discharge

5.7

Truck and tanker are checked to ensure correct placarding before departure

5.8

Site plan is followed for exiting site

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Conduct pre-discharge activities

1.1

Delivery location is checked against site plan and delivery job sheet

1.2

Job hazards are identified and required action is taken to minimise, control or eliminate identified hazards

1.3

Tanker is positioned to enable discharging to be carried out in accordance with site procedures without injury to people or damage to property

1.4

Park brake is applied, engine turned is off and battery is isolated, as required

1.5

Personal protective equipment is used in accordance with site and organisational procedures

1.6

Site authority to proceed is obtained, as required, and followed in accordance with site organisational procedures

2

Prepare for discharging

2.1

Delivery location is checked for hazards and set up, in accordance with regulatory requirements and organisational procedures

2.2

Lids on spillbox are lifted and spillbox is drained of liquid

2.3

Identification (ID) markers and tumblers are checked against safe discharge unload plan to verify load will fit, as required

2.4

Hoses are removed from tanker and test date is checked

3

Follow discharge requirements and procedures

3.1

Site product type, quantity and discharged quantity are checked to determine whether receiving vessel can accept to load, and discrepancies are rectified in accordance with organisational procedures

3.2

Locations of emergency equipment and emergency procedures are identified before discharging commences

3.3

Product transfer equipment is connected in accordance with regulatory and organisational requirements

3.4

Internal valve is opened

3.5

Checks are completed prior to commencing discharge, in accordance with organisational procedures

3.6

Valve is fully opened and product is discharged safely, in accordance with regulatory and organisational requirements and site procedures

3.7

Discharging process is monitored in accordance with regulatory requirements, and company and site procedures

3.8

Tanks and compartments are changed in accordance with regulatory and organisational requirements and site procedures

4

Work at heights on a dangerous tanker

4.1

Safety equipment is connected to tanker prior to ascending tanker ladders, as required, in accordance with safety regulations and site procedures

4.2

Safety equipment is connected when operating on top of tanker, as required, in accordance with site and safety regulations

4.3

Work is completed in accordance with regulatory and organisational requirements and site procedures

5

Finish unloading

5.1

All valves on tanker and receiving facility are closed and transfer equipment is secured in accordance with site procedures

5.2

Site is re-dipped and readings are recorded on delivery documentation

5.3

Site is restored to a clean and tidy condition in accordance with site procedures and site defects are reported

5.4

Final safety inspection of tanker and site is conducted

5.5

Tanker is moved from unloading area without damage to property or injury to people and in accordance with site procedures

5.6

Delivery documentation is completed, checked and adjusted, and secured in tanker in accordance with regulatory and organisational requirements at completion of discharge

5.7

Truck and tanker are checked to ensure correct placarding before departure

5.8

Site plan is followed for exiting site

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying correct methods for ascending and descending a tanker ladder

completing documentation required for discharging a dangerous goods tanker including:

dangerous goods shipping documentation, current Australian Dangerous Goods (ADG) Code

transport regulations as they apply to the enterprise, including local authority regulations and procedures

relevant Australian Standards and certification requirements

workplace policies and procedures

relevant internal data entry books, including logbooks, data sheets and load sheets

connecting transfer equipment

identifying and interpreting containers and goods coding, markings and emergency information panels for mode of transport/storage selected

reading and interpreting relevant instructions, procedures, information and signs

using emergency equipment including:

emergency shutdown controls

evacuation controls

eye wash equipment and safety showers

fire extinguishers

spill control equipment

using personal protective equipment and safety measures including:

chemical resistant gloves

communication devices

evacuation controls

high visibility clothing and safety vest

intrinsically safe, full cover protective clothing

safety headwear and footwear

safety glasses.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

applicable legislative procedures and codes

current ADG Code

environmental protection legislation and regulations

fatigue management regulations

relevant state/territory roads and traffic authority driving regulations and licence or permit requirements for operating heavy vehicles on unsealed roads

road rules

work health and safety (WHS)/occupational health and safety (OHS) legislation

characteristics of various classes of explosives and dangerous goods relevant to handling the class of explosives and dangerous goods concerned

compatibility of various types of explosives and dangerous goods

control operation

relevant WHS/OHS and environmental procedures and regulations

risks and hazards when loading, unloading and handling explosives and dangerous goods, and related precautions to control the risks

workplace procedures and policies for loading and unloading explosives and dangerous goods.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.