Evidence Guide: TLIL3072 - Operate signal panel or equipment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIL3072 - Operate signal panel or equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to operate signal control location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reporting for duty is undertaken in accordance with work health and safety (WHS)/occupational health and safety (OHS) requirements and organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate network control officer is contacted as required in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is checked for local activities and/or rail traffic movements that may affect rail traffic operations in accordance with organisational procedures and policies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signalling equipment is switched in for use as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operation of equipment is tested in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control local rail traffic movements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Local rail traffic movements are coordinated with relevant personnel in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signalling systems are operated and monitored to ensure safe movement of rail traffic

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Activities that may affect operations are reported and recorded in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication with relevant rail safety workers is undertaken to ensure they are informed of local rail traffic movements, in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication with other relevant personnel is undertaken to ensure they are informed of local rail traffic movements, in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and respond to system alarms

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

System alarms are monitored as required by organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Activated alarms are responded to appropriately and reported to appropriate personnel in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identified faults are reported to appropriate personnel in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement contingency plans as instructed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Contingency plan to suit disruption, system failure or fault is actioned as instructed, in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Local rail traffic movements are adjusted in accordance with organisational and/or local operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communications with network control officer and other relevant personnel are established and maintained as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Update local rail traffic movement documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Local rail traffic movement documentation is amended, compiled and recorded in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Local rail traffic movement information and documentation are handed over when relieved and/or at the completion of shift, in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Handover control to relieving signaller

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relieving signaller is informed of operational status and ongoing issues in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is checked to ensure it is uptodate and is then endorsed in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take over control from signaller

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Information on operational status and ongoing issues is received from signaller in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is checked to ensure it corresponds to operational status and is then endorsed in accordance with organisational policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to operate signal control location

1.1

Reporting for duty is undertaken in accordance with work health and safety (WHS)/occupational health and safety (OHS) requirements and organisational policies and procedures

1.2

Appropriate network control officer is contacted as required in accordance with organisational policies and procedures

1.3

Documentation is checked for local activities and/or rail traffic movements that may affect rail traffic operations in accordance with organisational procedures and policies

1.4

Signalling equipment is switched in for use as required

1.5

Operation of equipment is tested in accordance with organisational policies and procedures

2

Control local rail traffic movements

2.1

Local rail traffic movements are coordinated with relevant personnel in accordance with organisational policies and procedures

2.2

Signalling systems are operated and monitored to ensure safe movement of rail traffic

2.3

Activities that may affect operations are reported and recorded in accordance with organisational policies and procedures

3

Communicate with relevant personnel

3.1

Communication with relevant rail safety workers is undertaken to ensure they are informed of local rail traffic movements, in accordance with organisational policies and procedures

3.2

Communication with other relevant personnel is undertaken to ensure they are informed of local rail traffic movements, in accordance with organisational policies and procedures

4

Monitor and respond to system alarms

4.1

System alarms are monitored as required by organisational policies and procedures

4.2

Activated alarms are responded to appropriately and reported to appropriate personnel in accordance with organisational policies and procedures

4.3

Identified faults are reported to appropriate personnel in accordance with organisational policies and procedures

5

Implement contingency plans as instructed

5.1

Contingency plan to suit disruption, system failure or fault is actioned as instructed, in accordance with organisational policies and procedures

5.2

Local rail traffic movements are adjusted in accordance with organisational and/or local operational requirements

5.3

Communications with network control officer and other relevant personnel are established and maintained as required

6

Update local rail traffic movement documentation

6.1

Local rail traffic movement documentation is amended, compiled and recorded in accordance with organisational policies and procedures

6.2

Local rail traffic movement information and documentation are handed over when relieved and/or at the completion of shift, in accordance with organisational policies and procedures

7

Handover control to relieving signaller

7.1

Relieving signaller is informed of operational status and ongoing issues in accordance with organisational policies and procedures

7.2

Documentation is checked to ensure it is uptodate and is then endorsed in accordance with organisational policies and procedures

8

Take over control from signaller

8.1

Information on operational status and ongoing issues is received from signaller in accordance with organisational policies and procedures

8.2

Documentation is checked to ensure it corresponds to operational status and is then endorsed in accordance with organisational policies and procedures

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to operate signal control location

1.1

Reporting for duty is undertaken in accordance with work health and safety (WHS)/occupational health and safety (OHS) requirements and organisational policies and procedures

1.2

Appropriate network control officer is contacted as required in accordance with organisational policies and procedures

1.3

Documentation is checked for local activities and/or rail traffic movements that may affect rail traffic operations in accordance with organisational procedures and policies

1.4

Signalling equipment is switched in for use as required

1.5

Operation of equipment is tested in accordance with organisational policies and procedures

2

Control local rail traffic movements

2.1

Local rail traffic movements are coordinated with relevant personnel in accordance with organisational policies and procedures

2.2

Signalling systems are operated and monitored to ensure safe movement of rail traffic

2.3

Activities that may affect operations are reported and recorded in accordance with organisational policies and procedures

3

Communicate with relevant personnel

3.1

Communication with relevant rail safety workers is undertaken to ensure they are informed of local rail traffic movements, in accordance with organisational policies and procedures

3.2

Communication with other relevant personnel is undertaken to ensure they are informed of local rail traffic movements, in accordance with organisational policies and procedures

4

Monitor and respond to system alarms

4.1

System alarms are monitored as required by organisational policies and procedures

4.2

Activated alarms are responded to appropriately and reported to appropriate personnel in accordance with organisational policies and procedures

4.3

Identified faults are reported to appropriate personnel in accordance with organisational policies and procedures

5

Implement contingency plans as instructed

5.1

Contingency plan to suit disruption, system failure or fault is actioned as instructed, in accordance with organisational policies and procedures

5.2

Local rail traffic movements are adjusted in accordance with organisational and/or local operational requirements

5.3

Communications with network control officer and other relevant personnel are established and maintained as required

6

Update local rail traffic movement documentation

6.1

Local rail traffic movement documentation is amended, compiled and recorded in accordance with organisational policies and procedures

6.2

Local rail traffic movement information and documentation are handed over when relieved and/or at the completion of shift, in accordance with organisational policies and procedures

7

Handover control to relieving signaller

7.1

Relieving signaller is informed of operational status and ongoing issues in accordance with organisational policies and procedures

7.2

Documentation is checked to ensure it is uptodate and is then endorsed in accordance with organisational policies and procedures

8

Take over control from signaller

8.1

Information on operational status and ongoing issues is received from signaller in accordance with organisational policies and procedures

8.2

Documentation is checked to ensure it corresponds to operational status and is then endorsed in accordance with organisational policies and procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant safeworking system rules and workplace procedures

communicating effectively with others

completing relevant documentation and entering data accurately

controlling rail traffic movement

handing over or relieving the signaller

implementing contingency plans

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

operating a signal panel or equipment

operating communications systems in accordance with workplace protocol

reading, interpreting and following relevant instructions, procedures and information

reporting and rectifying identified problems, faults and malfunctions within limits of own role, in accordance with organisational procedures

updating traffic movement documentation

using appropriate numeric functions when controlling rail traffic movement.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

organisational procedures for controlling and coordinating local rail traffic operations

problems that may occur when operating signal panel or equipment, and action that should be taken to resolve these problems

relevant documentation requirements

relevant sections of applicable state/territory legislated rail safety and safeworking requirements, relevant codes of practice and/or guidelines

signalling and control systems and operations

specific local conditions and restrictions

types of communications systems available

types of surveillance and alarm systems in use.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.