Evidence Guide: TLIL4021 - Coordinate the erection and dismantling of temporary storage facilities

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIL4021 - Coordinate the erection and dismantling of temporary storage facilities

What evidence can you provide to prove your understanding of each of the following citeria?

Plan erection of temporary storage facility

  1. Plans, storage specifications, assembly details and erection sequence are obtained and examined for accuracy to meet intended storage requirements
  2. Engineering drawings, computations and instructions are obtained from qualified persons as required
  3. Local and state/territory authority approvals for storage facility construction are obtained
  4. Hazards are identified, risks are assessed and control measures are implemented
  5. Labour and equipment requirements for storage facility construction are organised and scheduled in accordance with erection sequence
Plans, storage specifications, assembly details and erection sequence are obtained and examined for accuracy to meet intended storage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engineering drawings, computations and instructions are obtained from qualified persons as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Local and state/territory authority approvals for storage facility construction are obtained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Labour and equipment requirements for storage facility construction are organised and scheduled in accordance with erection sequence

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect temporary storage facility

  1. Foundations and earthworks for temporary storage are prepared in accordance with workplace instructions and specifications
  2. Structural and storage components are assembled and placed in accordance with workplace instructions and specifications
  3. Protective sheeting (floor and wall) is placed and sealed/sewn in accordance with workplace specifications
  4. Material is placed into temporary storage facility in accordance with specifications and site procedures
  5. Grain protection measures are implemented in accordance with workplace requirements
  6. Labour and equipment are coordinated for timely and efficient completion of work
Foundations and earthworks for temporary storage are prepared in accordance with workplace instructions and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structural and storage components are assembled and placed in accordance with workplace instructions and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protective sheeting (floor and wall) is placed and sealed/sewn in accordance with workplace specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material is placed into temporary storage facility in accordance with specifications and site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grain protection measures are implemented in accordance with workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Labour and equipment are coordinated for timely and efficient completion of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dismantle temporary storage facility after out loading

  1. Procedures for dismantling temporary storage facility, including sequencing of processes, are confirmed with qualified personnel
  2. Labour and equipment requirements for dismantling temporary storage facility are organised and scheduled
  3. Material is removed from storage in accordance with workplace procedures
  4. Protective sheeting (floor and wall) is dismantled and folded for future use or disposed of, in accordance with workplace procedures
  5. Structural components are disassembled, transported and stacked in accordance with workplace instructions
  6. Labour and equipment are coordinated for timely and efficient completion of work
Procedures for dismantling temporary storage facility, including sequencing of processes, are confirmed with qualified personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Labour and equipment requirements for dismantling temporary storage facility are organised and scheduled

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material is removed from storage in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protective sheeting (floor and wall) is dismantled and folded for future use or disposed of, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structural components are disassembled, transported and stacked in accordance with workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Labour and equipment are coordinated for timely and efficient completion of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan erection of temporary storage facility

1.1

Plans, storage specifications, assembly details and erection sequence are obtained and examined for accuracy to meet intended storage requirements

1.2

Engineering drawings, computations and instructions are obtained from qualified persons as required

1.3

Local and state/territory authority approvals for storage facility construction are obtained

1.4

Hazards are identified, risks are assessed and control measures are implemented

1.5

Labour and equipment requirements for storage facility construction are organised and scheduled in accordance with erection sequence

2

Erect temporary storage facility

2.1

Foundations and earthworks for temporary storage are prepared in accordance with workplace instructions and specifications

2.2

Structural and storage components are assembled and placed in accordance with workplace instructions and specifications

2.3

Protective sheeting (floor and wall) is placed and sealed/sewn in accordance with workplace specifications

2.4

Material is placed into temporary storage facility in accordance with specifications and site procedures

2.5

Grain protection measures are implemented in accordance with workplace requirements

2.6

Labour and equipment are coordinated for timely and efficient completion of work

3

Dismantle temporary storage facility after out loading

3.1

Procedures for dismantling temporary storage facility, including sequencing of processes, are confirmed with qualified personnel

3.2

Labour and equipment requirements for dismantling temporary storage facility are organised and scheduled

3.3

Material is removed from storage in accordance with workplace procedures

3.4

Protective sheeting (floor and wall) is dismantled and folded for future use or disposed of, in accordance with workplace procedures

3.5

Structural components are disassembled, transported and stacked in accordance with workplace instructions

3.6

Labour and equipment are coordinated for timely and efficient completion of work

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan erection of temporary storage facility

1.1

Plans, storage specifications, assembly details and erection sequence are obtained and examined for accuracy to meet intended storage requirements

1.2

Engineering drawings, computations and instructions are obtained from qualified persons as required

1.3

Local and state/territory authority approvals for storage facility construction are obtained

1.4

Hazards are identified, risks are assessed and control measures are implemented

1.5

Labour and equipment requirements for storage facility construction are organised and scheduled in accordance with erection sequence

2

Erect temporary storage facility

2.1

Foundations and earthworks for temporary storage are prepared in accordance with workplace instructions and specifications

2.2

Structural and storage components are assembled and placed in accordance with workplace instructions and specifications

2.3

Protective sheeting (floor and wall) is placed and sealed/sewn in accordance with workplace specifications

2.4

Material is placed into temporary storage facility in accordance with specifications and site procedures

2.5

Grain protection measures are implemented in accordance with workplace requirements

2.6

Labour and equipment are coordinated for timely and efficient completion of work

3

Dismantle temporary storage facility after out loading

3.1

Procedures for dismantling temporary storage facility, including sequencing of processes, are confirmed with qualified personnel

3.2

Labour and equipment requirements for dismantling temporary storage facility are organised and scheduled

3.3

Material is removed from storage in accordance with workplace procedures

3.4

Protective sheeting (floor and wall) is dismantled and folded for future use or disposed of, in accordance with workplace procedures

3.5

Structural components are disassembled, transported and stacked in accordance with workplace instructions

3.6

Labour and equipment are coordinated for timely and efficient completion of work

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria on at least one occasion and include:

applying precautions and required action to minimise, control or eliminate identified hazards

applying relevant legislation and workplace procedures

communicating and working effectively with others

completing relevant documentation

identifying, selecting and using relevant equipment

implementing contingency plans

modifying activities depending on operational contingencies, risk situations and environments

monitoring and prioritising work activities in terms of planned schedule

operating and adapting to differences in equipment in accordance with operating procedures

operating electronic communications equipment to required protocol

planning own work, predicting consequences and identifying improvements

reading, interpreting and following relevant instructions, procedures and signs

selecting and using required personal protective equipment conforming to industry and work health and safety (WHS)/occupational health and safety (OHS) standards

working systematically with required attention to detail without injury to self or others, or damage to goods or equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and include knowledge of:

emergency response procedures

equipment applications, capacities, configurations, safety hazards and control mechanisms

grain protection measures

how to identify characteristics of commodity types, varieties and grades

problems that may occur and appropriate action that can be taken to resolve these problems

procedures for environmental control and disposal activities

range of construction methods used in erecting temporary storage facilities

regulations relevant to erecting and dismantling temporary grain storage facilities

site layout and obstacles

storage and safe handling procedures

workplace procedures and policies for coordinating the erection and dismantling of temporary grain storage facilities.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.