Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLILIC2005 - Licence to operate a boom-type elevating work platform (boom length 11 metres or more)

What evidence can you provide to prove your understanding of each of the following citeria?

Plan work

  1. Potential workplace hazards are identified
  2. Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment
  3. Elevating work platform is appropriate for the task
  4. Appropriate communications methods are identified
Potential workplace hazards are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevating work platform is appropriate for the task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate communications methods are identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct routine checks

  1. Service logbook for elevating work platform is checked for compliance
  2. Elevating work platform is visually checked for damage or defects in accordance with procedures
  3. Routine pre-operational checks are carried out in accordance with procedures
  4. Safety equipment is inspected in accordance with procedures
  5. Elevating work platform is accessed in a safe manner
  6. Safety equipment is fitted and secured to elevating work platform in accordance with procedures
  7. All controls are located and identified
  8. Elevating work platform is started in accordance with procedures
  9. All safety devices are identified and tested in accordance with procedures
  10. Post-start operational checks are carried out in accordance with procedures
  11. Communications equipment is checked for serviceability
  12. All damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken
Service logbook for elevating work platform is checked for compliance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevating work platform is visually checked for damage or defects in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine pre-operational checks are carried out in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety equipment is inspected in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevating work platform is accessed in a safe manner

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety equipment is fitted and secured to elevating work platform in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All controls are located and identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevating work platform is started in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All safety devices are identified and tested in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Post-start operational checks are carried out in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communications equipment is checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up elevating work platform

  1. Ground suitability is inspected and checked
  2. Elevating work platform is driven to or located at work area in accordance with procedures
  3. Elevating work platform is positioned for work application and stability in accordance with procedures
  4. Appropriate hazard prevention/control measures are applied to work area in accordance with procedures
  5. Work gear and tools are stowed and secured
Ground suitability is inspected and checked

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevating work platform is driven to or located at work area in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevating work platform is positioned for work application and stability in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate hazard prevention/control measures are applied to work area in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work gear and tools are stowed and secured

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate elevating work platform

  1. Elevating work platform is operated using all relevant plant movements in accordance with procedures and appropriate standards
  2. Elevating work platform is mobilised using best mobile practice and appropriate procedures
  3. Elevated working platform operations are monitored constantly, to ensure safety of personnel and stability
  4. Unplanned and/or unsafe situations are responded to in accordance with procedures
Elevating work platform is operated using all relevant plant movements in accordance with procedures and appropriate standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevating work platform is mobilised using best mobile practice and appropriate procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevated working platform operations are monitored constantly, to ensure safety of personnel and stability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned and/or unsafe situations are responded to in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down and secure elevating work platform

  1. Elevating work platform is lowered and stowed in accordance with procedures
  2. Relevant motion locks and brakes are applied as required
  3. Safety equipment is disconnected from platform
  4. Egress from elevated work platform is conducted in accordance with procedures
  5. Outriggers/stabilisers are stowed and secured in accordance with procedures as required
  6. Plates or packing are stowed and secured as required
  7. Elevating work platform is shut down in accordance with procedures
  8. Routine post-operational checks are carried out in accordance with procedures
  9. Damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken
Elevating work platform is lowered and stowed in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant motion locks and brakes are applied as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety equipment is disconnected from platform

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Egress from elevated work platform is conducted in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Outriggers/stabilisers are stowed and secured in accordance with procedures as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plates or packing are stowed and secured as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Elevating work platform is shut down in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine post-operational checks are carried out in accordance with procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan work

1.1

Potential workplace hazards are identified

1.2

Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment

1.3

Elevating work platform is appropriate for the task

1.4

Appropriate communications methods are identified

2

Conduct routine checks

2.1

Service logbook for elevating work platform is checked for compliance

2.2

Elevating work platform is visually checked for damage or defects in accordance with procedures

2.3

Routine pre-operational checks are carried out in accordance with procedures

2.4

Safety equipment is inspected in accordance with procedures

2.5

Elevating work platform is accessed in a safe manner

2.6

Safety equipment is fitted and secured to elevating work platform in accordance with procedures

2.7

All controls are located and identified

2.8

Elevating work platform is started in accordance with procedures

2.9

All safety devices are identified and tested in accordance with procedures

2.10

Post-start operational checks are carried out in accordance with procedures

2.11

Communications equipment is checked for serviceability

2.12

All damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken

3

Set up elevating work platform

3.1

Ground suitability is inspected and checked

3.2

Elevating work platform is driven to or located at work area in accordance with procedures

3.3

Elevating work platform is positioned for work application and stability in accordance with procedures

3.4

Appropriate hazard prevention/control measures are applied to work area in accordance with procedures

3.5

Work gear and tools are stowed and secured

4

Operate elevating work platform

4.1

Elevating work platform is operated using all relevant plant movements in accordance with procedures and appropriate standards

4.2

Elevating work platform is mobilised using best mobile practice and appropriate procedures

4.3

Elevated working platform operations are monitored constantly, to ensure safety of personnel and stability

4.4

Unplanned and/or unsafe situations are responded to in accordance with procedures

5

Shut down and secure elevating work platform

5.1

Elevating work platform is lowered and stowed in accordance with procedures

5.2

Relevant motion locks and brakes are applied as required

5.3

Safety equipment is disconnected from platform

5.4

Egress from elevated work platform is conducted in accordance with procedures

5.5

Outriggers/stabilisers are stowed and secured in accordance with procedures as required

5.6

Plates or packing are stowed and secured as required

5.7

Elevating work platform is shut down in accordance with procedures

5.8

Routine post-operational checks are carried out in accordance with procedures

5.9

Damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan work

1.1

Potential workplace hazards are identified

1.2

Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment

1.3

Elevating work platform is appropriate for the task

1.4

Appropriate communications methods are identified

2

Conduct routine checks

2.1

Service logbook for elevating work platform is checked for compliance

2.2

Elevating work platform is visually checked for damage or defects in accordance with procedures

2.3

Routine pre-operational checks are carried out in accordance with procedures

2.4

Safety equipment is inspected in accordance with procedures

2.5

Elevating work platform is accessed in a safe manner

2.6

Safety equipment is fitted and secured to elevating work platform in accordance with procedures

2.7

All controls are located and identified

2.8

Elevating work platform is started in accordance with procedures

2.9

All safety devices are identified and tested in accordance with procedures

2.10

Post-start operational checks are carried out in accordance with procedures

2.11

Communications equipment is checked for serviceability

2.12

All damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken

3

Set up elevating work platform

3.1

Ground suitability is inspected and checked

3.2

Elevating work platform is driven to or located at work area in accordance with procedures

3.3

Elevating work platform is positioned for work application and stability in accordance with procedures

3.4

Appropriate hazard prevention/control measures are applied to work area in accordance with procedures

3.5

Work gear and tools are stowed and secured

4

Operate elevating work platform

4.1

Elevating work platform is operated using all relevant plant movements in accordance with procedures and appropriate standards

4.2

Elevating work platform is mobilised using best mobile practice and appropriate procedures

4.3

Elevated working platform operations are monitored constantly, to ensure safety of personnel and stability

4.4

Unplanned and/or unsafe situations are responded to in accordance with procedures

5

Shut down and secure elevating work platform

5.1

Elevating work platform is lowered and stowed in accordance with procedures

5.2

Relevant motion locks and brakes are applied as required

5.3

Safety equipment is disconnected from platform

5.4

Egress from elevated work platform is conducted in accordance with procedures

5.5

Outriggers/stabilisers are stowed and secured in accordance with procedures as required

5.6

Plates or packing are stowed and secured as required

5.7

Elevating work platform is shut down in accordance with procedures

5.8

Routine post-operational checks are carried out in accordance with procedures

5.9

Damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken

A person who demonstrates competency in this unit must provide evidence of safely operating a boom type elevating work platform with a boom lengths of 11 metres or more and satisfy all of the elements, performance criteria and foundation skills requirements of the unit on at least one occasion including:

applying appropriate mathematical procedures to estimate loads

applying best operating practice including:

avoiding ground depressions

gently accelerating and braking

minimum speed

minimum boom/jib length

applying emergency procedures and safety equipment, including the use of safety harnesses, energy absorbers, lanyard and anchor points

applying hazard prevention/control measures including:

disconnected power

illumination requirements

insulated electric lines

moving obstructions

pedestrian controls

personal protective equipment

safety tags on electrical switches/isolators

using safety observer inside exclusion zone

suitable area for set-up

suitable firm and stable standing

traffic barricades and controls

trench covers

applying relevant plant movements including:

articulating

hinging

lowering boom

raising boom

slewing

telescoping

applying risk assessment and hazard control strategies, including hierarchy of control as applied to positioning and safely operating an elevating work platform

assessing ground conditions to confirm site is suitable (e.g. firm, level and safe) to extend and travel the elevating work platform

communicating with other workplace personnel through:

appropriate worksite protocols

bells

buzzers

listening

making and interpreting hand signals

questioning to confirm understanding

signage

two way radios

verbal and non-verbal language

written instructions

complying with WHS/OHS licensing legislation

identifying problems and equipment faults and where practicable demonstrating appropriate response procedures

operating and controlling a boom type elevating work platform including all functions to their maximum extension within the safe working (rated) capacity including:

a telescoping device

articulated device

hinged device

or any combination of the above used to support a platform on which personnel, equipment and materials may be elevated to perform work

positioning, stabilising, set up of elevating work platforms, including the use of outriggers/stabilisers and packing to ensure that the safest lift is performed

receiving and interpreting workplace instructions, safety information, emergency procedures

recording and maintaining accurate information relating to operating elevating work platform

shutting down a boom type elevating work platform in accordance with manufacturer specifications and workplace procedures including:

idling engine to stabilise temperature

folding boom/jib into the transport position

removing key from ignition

retracting boom/jib

retracting outriggers/stabilisers

turning off engine

stabilising a boom type elevating work platform by:

correctly positioning plates or packing

deploying outriggers

establishing correct size plates or packing

using and interpreting manufacturer specifications and data

using communications signals including:

luff boom down – hand

luff boom down – whistle and/or two-way radio

luff boom up – hand

luff boom up – whistle and/two-way radio

stop –hand

stop – whistle and/or two-way radio

telescope out – hand

telescope out – whistle and/or two-way radio

telescope in – hand

telescope in – whistle and/or two-way radio

using outriggers/stabilisers and packing to ensure safest lift is performed

verifying problems and equipment faults and applying appropriate response procedures to unplanned and/or unsafe situations including:

contact with overhead electrical conductors

damage caused by contact with obstructions

environmental conditions (e.g. wind, lightning, storms, etc.)

failure of controls

illness of personnel

loss of power.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

appropriate mathematical procedures for estimating loads to ensure elevating work platform is not overloaded

Australian and industry standards relevant to operating a boom-type elevating work platform (boom length 11 metres or more)

boom length capability including:

nominal reach, measured horizontally from centre point of rotation to outer edge of platform in its most extended position

vertical distance from floor of platform to surface supporting elevating work platform with platform at its maximum height

Commonwealth, state or territory WHS/OHS legislation, standards and codes of practice relevant to the full range of processes for the crane class

ground stability including:

backfilled ground

bitumen

concrete

hard compacted soil

rock

rough uneven ground

soft soils

elevating work platform characteristics, operations and operating techniques

emergency procedures and safety equipment, including the use of safety harness, energy absorber, lanyard and anchor points

hazards including:

environmental conditions (e.g. wind, lightning, storms, etc.)

ground stability (e.g. ground condition, recently filled trenches, slopes)

insufficient lighting

other specific hazards (e.g. tidal areas, chainsaws, pressure washers, dangerous materials

overhead hazards (e.g. electric lines, service pipes, trees, buildings etc.)

traffic (e.g. pedestrians, vehicles, plant)

hierarchy of hazard identification and control:

elimination

substitution

isolation

engineering controls

administrative controls

personal protective equipment (PPE)

procedures for recording, reporting and maintaining workplace records and information, including using the service logbook

organisational and workplace standards, requirements, policies and procedures for conducting elevating work platform operations

rated capacity and working load limits

risks associated with overhead electric lines/electrical cables, ground conditions, wind, pedestrians and tipping

systematic process of eliminating or reducing risk to personnel and property through the application of controls

typical routine problems encountered in the process and with equipment, and adjustments required for correction.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.