The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan work
|
|
Potential workplace hazards are identified Completed |
Evidence:
|
Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment Completed |
Evidence:
|
Weight of load is identified and estimated in consultation with associated personnel Completed |
Evidence:
|
Crane is appropriate to the load/s and workplace conditions Completed |
Evidence:
|
Appropriate path for moving loads in work area is inspected and determined Completed |
Evidence:
|
Appropriate communications methods are identified in consultation with associated personnel Completed |
Evidence:
|
Conduct routine checks
|
|
Crane is visually checked for any damage or defects Completed |
Evidence:
|
Crane is accessed in a safe manner Completed |
Evidence:
|
All signage and labels are checked to ensure they are visible and legible in accordance with the appropriate standard Completed |
Evidence:
|
Routine pre-operational crane checks are carried out in accordance with procedures Completed |
Evidence:
|
All controls are located and identified Completed |
Evidence:
|
Crane service logbook is checked for compliance Completed |
Evidence:
|
Crane is started in accordance with procedures and is checked for any abnormal noises Completed |
Evidence:
|
All crane safety devices are tested in accordance with procedures Completed |
Evidence:
|
Post-start operational checks are carried out in accordance with procedures Completed |
Evidence:
|
All communications equipment is checked for serviceability Completed |
Evidence:
|
All damage and defects are reported and recorded in accordance with procedures, and appropriate action is taken Completed |
Evidence:
|
Set up crane
|
|
Ground suitability is checked Completed |
Evidence:
|
Crane is driven to work area in accordance with procedures Completed |
Evidence:
|
Crane is positioned for work application and stability in accordance with procedures Completed |
Evidence:
|
Appropriate crane configuration for work task is determined in accordance with procedures Completed |
Evidence:
|
Boom/jib and counterweight configuration data is input into crane computer as required Completed |
Evidence:
|
Appropriate hazard prevention/control measures are applied to work area in accordance with procedures Completed |
Evidence:
|
All communications equipment is tested for functionality Completed |
Evidence:
|
Transfer load
|
|
Lifts are determined within the capacity of the crane Completed |
Evidence:
|
Boom/jib and hoist block is positioned over load following directions from associated personnel Completed |
Evidence:
|
Test lift is carried out in accordance with procedures to allow for checks to be safely made, in consultation with relevant personnel Completed |
Evidence:
|
Loads are transferred using all relevant crane movements in accordance with procedures and the appropriate standard Completed |
Evidence:
|
All required communications signals are correctly interpreted in accordance with procedures and the appropriate standard Completed |
Evidence:
|
Crane is operated in accordance with procedures Completed |
Evidence:
|
Load movement is monitored constantly, to ensure safety of personnel and load, and crane stability Completed |
Evidence:
|
Unplanned and/or unsafe situations are responded to in accordance with procedures Completed |
Evidence:
|
Mobile load
|
|
Suitability of planned route for crane is checked in accordance with procedures Completed |
Evidence:
|
Crane is configured to mobile load in accordance with procedures Completed |
Evidence:
|
Load is moved using best mobile practice in accordance with the appropriate standard Completed |
Evidence:
|
Shut down and secure crane
|
|
Crane boom/jib and equipment are stowed and secured as required, in accordance with procedures and the appropriate standard Completed |
Evidence:
|
Relevant motion locks and brakes are applied as required Completed |
Evidence:
|
Outriggers/stabilisers are stowed and secured as required in accordance with procedures Completed |
Evidence:
|
Crane is shut down in accordance with procedures Completed |
Evidence:
|
Routine post-operational crane checks are carried out in accordance with procedures Completed |
Evidence:
|
Plates or packing are stowed and secured as required Completed |
Evidence:
|
All damage and defects are recorded and reported in accordance with procedures, and appropriate action is taken Completed |
Evidence:
|