The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIS2004 - Install and maintain rail bonding systems

What evidence can you provide to prove your understanding of each of the following citeria?

Plan the installation and maintenance of the relevant bonding systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Works order including drawings, plans and material lists is received/accessed, analysed and confirmed as required by site inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is assessed and prioritised in accordance with works scheduled

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site relevant electrical permits are accessed and/or obtained as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources including personnel, plant, equipment and tools are identified and scheduled

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison and communication issues with other personnel, authorities, clients and landowners are resolved

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare the worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personnel participating in the task, including plant operators and contractors, are fully briefed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site preparation is completed in accordance with works order

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specialist testing and earth equipment is inspected as required and replaced if defective

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Road signs, barriers and warning devices are positioned as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safeworking practices are observed on or about the running track/line

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and maintain bonding system cables

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Systems and circuits are isolated as required, proved safe to work on in accordance with work plan and electrical permits are issued/accepted/relinquished as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable and surrounds, including rail and other surfaces, are prepared to appropriate specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bonds are attached in accordance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Joint and termination procedures are carried out in accordance with authorised work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continuity testing procedures are carried out as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

System is commissioned following visual inspection and the completion of other testing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct post-operational activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is rehabilitated in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is completed in an agreed time and with minimum waste

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Notifications, records and documentation for updating system data are completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan the installation and maintenance of the relevant bonding systems

1.1

Works order including drawings, plans and material lists is received/accessed, analysed and confirmed as required by site inspection

1.2

Work is assessed and prioritised in accordance with works scheduled

1.3

Site relevant electrical permits are accessed and/or obtained as required

1.4

Hazards are identified, risks are assessed and control measures are implemented

1.5

Resources including personnel, plant, equipment and tools are identified and scheduled

1.6

Liaison and communication issues with other personnel, authorities, clients and landowners are resolved

2

Prepare the worksite

2.1

Personnel participating in the task, including plant operators and contractors, are fully briefed

2.2

Site preparation is completed in accordance with works order

2.3

Specialist testing and earth equipment is inspected as required and replaced if defective

2.4

Road signs, barriers and warning devices are positioned as required

2.5

Safeworking practices are observed on or about the running track/line

3

Install and maintain bonding system cables

3.1

Systems and circuits are isolated as required, proved safe to work on in accordance with work plan and electrical permits are issued/accepted/relinquished as required

3.2

Cable and surrounds, including rail and other surfaces, are prepared to appropriate specifications

3.3

Bonds are attached in accordance with specifications

3.4

Joint and termination procedures are carried out in accordance with authorised work procedures

3.5

Continuity testing procedures are carried out as required

3.6

System is commissioned following visual inspection and the completion of other testing

4

Conduct post-operational activities

4.1

Worksite is rehabilitated in accordance with workplace procedures

4.2

Work is completed in an agreed time and with minimum waste

4.3

Notifications, records and documentation for updating system data are completed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan the installation and maintenance of the relevant bonding systems

1.1

Works order including drawings, plans and material lists is received/accessed, analysed and confirmed as required by site inspection

1.2

Work is assessed and prioritised in accordance with works scheduled

1.3

Site relevant electrical permits are accessed and/or obtained as required

1.4

Hazards are identified, risks are assessed and control measures are implemented

1.5

Resources including personnel, plant, equipment and tools are identified and scheduled

1.6

Liaison and communication issues with other personnel, authorities, clients and landowners are resolved

2

Prepare the worksite

2.1

Personnel participating in the task, including plant operators and contractors, are fully briefed

2.2

Site preparation is completed in accordance with works order

2.3

Specialist testing and earth equipment is inspected as required and replaced if defective

2.4

Road signs, barriers and warning devices are positioned as required

2.5

Safeworking practices are observed on or about the running track/line

3

Install and maintain bonding system cables

3.1

Systems and circuits are isolated as required, proved safe to work on in accordance with work plan and electrical permits are issued/accepted/relinquished as required

3.2

Cable and surrounds, including rail and other surfaces, are prepared to appropriate specifications

3.3

Bonds are attached in accordance with specifications

3.4

Joint and termination procedures are carried out in accordance with authorised work procedures

3.5

Continuity testing procedures are carried out as required

3.6

System is commissioned following visual inspection and the completion of other testing

4

Conduct post-operational activities

4.1

Worksite is rehabilitated in accordance with workplace procedures

4.2

Work is completed in an agreed time and with minimum waste

4.3

Notifications, records and documentation for updating system data are completed

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least three separate occasions and include:

applying relevant safeworking and workplace procedures

communicating effectively with others

completing relevant documentation

guiding operators of plant and equipment and using appropriate signals when installing and maintaining cables

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

implementing contingency plans

interpreting and following operational instructions and prioritising work

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

organising activities in accordance with workplace procedures

reading and interpreting relevant technical data, drawings, instructions and manuals

reporting and/or rectifying identified problems, faults or malfunctions, in accordance with workplace procedures

selecting and using relevant equipment and tools

working collaboratively with others

working systematically with required attention to detail without injury to self or others, or damage to goods or equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

applicable state/territory legislated rail safety requirements, relevant codes of practice and/or guidelines

characteristics, capabilities and uses of various types of cables

circuits for signalling and communications systems awareness as a non-electrical rail safety worker

current capacities, inductance and capacitance, protection systems and devices

electrical hazard awareness including voltage and current transformation, voltage drop, cable and traction systems

joint test and fault identification/location workplace procedures

problems that may occur when installing and maintaining rail bonding systems and action that can be taken to report or resolve these problems

rail industry standards for installing and maintaining rail bonding systems

switching operation, isolation and access permit procedures

testing and commissioning procedures, including testing and earth/rail connecting conductors

traction earthing systems and bonding systems

work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

workplace documentation and records systems

workplace procedures for installing and maintaining rail bonding systems for non-electrical rail safety workers.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.