Evidence Guide: TLIS2013 - Install minor structures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIS2013 - Install minor structures

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Type of structure to be installed is identified and appropriate methods are planned in accordance with workplace procedures and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structure and/or materials required for installation are identified, obtained and prepared in accordance with plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble and install structural elements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavation is conducted as required, in accordance with workplace standards, procedures and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Foundations are installed as required, in accordance with workplace procedures and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components are assembled and installed using appropriate methods in accordance with specifications and/or plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Level/position of structure is adjusted to required standard to maintain correct track geometry/clearances

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fasteners are installed and tightened in position using correct fastening method to ensure structural integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installed structure is checked against specified requirements and/or plans, and required adjustments are made

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain structures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Components requiring replacement are checked against standards and are measured for preparation of replacement components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials required for job are identified and organised as required to enable appropriate replacement of components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replacement components are cut and shaped to required standard in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surfaces of components are treated using appropriate methods and materials as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site is cleaned up to remove unnecessary materials and is restored to environmentally sound and safe condition

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is executed and documentation is completed and processed as required in accordance with organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan and prepare for work

1.1

Type of structure to be installed is identified and appropriate methods are planned in accordance with workplace procedures and specifications

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Structure and/or materials required for installation are identified, obtained and prepared in accordance with plans and specifications

2

Assemble and install structural elements

2.1

Excavation is conducted as required, in accordance with workplace standards, procedures and regulatory requirements

2.2

Foundations are installed as required, in accordance with workplace procedures and specifications

2.3

Components are assembled and installed using appropriate methods in accordance with specifications and/or plans

2.4

Level/position of structure is adjusted to required standard to maintain correct track geometry/clearances

2.5

Fasteners are installed and tightened in position using correct fastening method to ensure structural integrity

2.6

Installed structure is checked against specified requirements and/or plans, and required adjustments are made

3

Maintain structures

3.1

Components requiring replacement are checked against standards and are measured for preparation of replacement components

3.2

Materials required for job are identified and organised as required to enable appropriate replacement of components

3.3

Replacement components are cut and shaped to required standard in accordance with workplace procedures

3.4

Surfaces of components are treated using appropriate methods and materials as required

4

Finalise work

4.1

Site is cleaned up to remove unnecessary materials and is restored to environmentally sound and safe condition

4.2

Work is executed and documentation is completed and processed as required in accordance with organisational procedures

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan and prepare for work

1.1

Type of structure to be installed is identified and appropriate methods are planned in accordance with workplace procedures and specifications

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Structure and/or materials required for installation are identified, obtained and prepared in accordance with plans and specifications

2

Assemble and install structural elements

2.1

Excavation is conducted as required, in accordance with workplace standards, procedures and regulatory requirements

2.2

Foundations are installed as required, in accordance with workplace procedures and specifications

2.3

Components are assembled and installed using appropriate methods in accordance with specifications and/or plans

2.4

Level/position of structure is adjusted to required standard to maintain correct track geometry/clearances

2.5

Fasteners are installed and tightened in position using correct fastening method to ensure structural integrity

2.6

Installed structure is checked against specified requirements and/or plans, and required adjustments are made

3

Maintain structures

3.1

Components requiring replacement are checked against standards and are measured for preparation of replacement components

3.2

Materials required for job are identified and organised as required to enable appropriate replacement of components

3.3

Replacement components are cut and shaped to required standard in accordance with workplace procedures

3.4

Surfaces of components are treated using appropriate methods and materials as required

4

Finalise work

4.1

Site is cleaned up to remove unnecessary materials and is restored to environmentally sound and safe condition

4.2

Work is executed and documentation is completed and processed as required in accordance with organisational procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

adapting to differences in equipment in accordance with operating procedures

applying relevant workplace procedures

checking compliance of work with job specifications

cleaning up the site after installation

following operational instructions and work sequences

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

installing the structure in accordance with workplace requirements

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

planning and preparing for installation

reading and interpreting relevant plans, specifications, instructions and manuals

reporting and rectifying problems, faults and malfunctions that may occur when installing minor structures in accordance with workplace procedures

selecting and using relevant equipment and tools.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

construction methods and techniques for minor structures

functions of different types of minor structures

hazards that may exist when installing minor structures, and ways of controlling the risks involved

problems that may occur when installing minor structures and action that can be taken to report or resolve these problems

relevant rail danger zones

relevant recording and documentation procedures

relevant rail industry standards for installing minor structures

relevant safety, work health and safety (WHS)/occupational health and safety (OHS), and environmental procedures and regulations

safety data sheets (SDSs)/material safety data sheets (MSDSs) and/or manufacturer instructions and workplace procedures and information on the use of epoxy and grouts for mortar pads

workplace procedures for installing minor structures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.