The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for work |
|
Completed |
Evidence:
|
Type of structure to be installed is identified and appropriate methods are planned in accordance with workplace procedures and specifications |
|
Completed |
Evidence:
|
Hazards are identified, risks are assessed and control measures are implemented |
|
Completed |
Evidence:
|
Structure and/or materials required for installation are identified, obtained and prepared in accordance with plans and specifications |
|
Completed |
Evidence:
|
Assemble and install structural elements |
|
Completed |
Evidence:
|
Excavation is conducted as required, in accordance with workplace standards, procedures and regulatory requirements |
|
Completed |
Evidence:
|
Foundations are installed as required, in accordance with workplace procedures and specifications |
|
Completed |
Evidence:
|
Components are assembled and installed using appropriate methods in accordance with specifications and/or plans |
|
Completed |
Evidence:
|
Level/position of structure is adjusted to required standard to maintain correct track geometry/clearances |
|
Completed |
Evidence:
|
Fasteners are installed and tightened in position using correct fastening method to ensure structural integrity |
|
Completed |
Evidence:
|
Installed structure is checked against specified requirements and/or plans, and required adjustments are made |
|
Completed |
Evidence:
|
Maintain structures |
|
Completed |
Evidence:
|
Components requiring replacement are checked against standards and are measured for preparation of replacement components |
|
Completed |
Evidence:
|
Materials required for job are identified and organised as required to enable appropriate replacement of components |
|
Completed |
Evidence:
|
Replacement components are cut and shaped to required standard in accordance with workplace procedures |
|
Completed |
Evidence:
|
Surfaces of components are treated using appropriate methods and materials as required |
|
Completed |
Evidence:
|
Finalise work |
|
Completed |
Evidence:
|
Site is cleaned up to remove unnecessary materials and is restored to environmentally sound and safe condition |
|
Completed |
Evidence:
|
Work is executed and documentation is completed and processed as required in accordance with organisational procedures |
|
Completed |
Evidence:
|