The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan installation |
|
Completed |
Evidence:
|
Work requirements are determined to identify scope of work and resources required |
|
Completed |
Evidence:
|
Hazards are identified, risks are assessed and control measures are implemented |
|
Completed |
Evidence:
|
Type of overhead wiring structure required for job is identified and organised |
|
Completed |
Evidence:
|
Prepare for installation |
|
Completed |
Evidence:
|
Footings are prepared and excavated in accordance with rail industry standards and workplace procedures |
|
Completed |
Evidence:
|
Formwork is installed in accordance with rail industry standards and workplace procedures |
|
Completed |
Evidence:
|
Concrete reinforcing is installed in accordance with rail industry standards and workplace procedures |
|
Completed |
Evidence:
|
Concrete is mixed and placed in accordance with rail industry standards and workplace procedures |
|
Completed |
Evidence:
|
Hold down plates/bolts are placed into concrete to correct dimensions to enable fitting of overhead wiring structure |
|
Completed |
Evidence:
|
Install components |
|
Completed |
Evidence:
|
Components are assembled onto bridge section as required in preparation for installation |
|
Completed |
Evidence:
|
Masts and other components are positioned and installed as required in accordance with accepted workplace procedures |
|
Completed |
Evidence:
|
Fastening systems are installed in accordance with rail industry standards to ensure the integrity of the overhead wiring structure |
|
Completed |
Evidence:
|
Complete documentation |
|
Completed |
Evidence:
|
Required documentation procedures and processes are confirmed |
|
Completed |
Evidence:
|
Documentation is filled in legibly and proofread |
|
Completed |
Evidence:
|
Documentation is processed in accordance with workplace procedures |
|
Completed |
Evidence:
|