Evidence Guide: TLIS2031 - Install railway sleepers

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIS2031 - Install railway sleepers

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation, replacement or repair method is selected to meet work requirements in accordance with worksite standards and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, equipment and materials are prepared for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore track gauge

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and tools appropriate to task are selected and checked for correct operation in accordance with manufacturer instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Track gauge is restored as required, using appropriate methods in accordance with worksite standards and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Track gauge measurements are recorded in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install or replace sleeper

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unserviceable sleepers are extracted as required, using manual or mechanical methods in accordance with worksite procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

New sleeper is installed using manual or mechanical methods in accordance with worksite procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sleeper plates are installed on relevant sleeper types in accordance with worksite procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sleeper is suitably packed or supported by appropriate methods in accordance with worksite procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is completed to meet track geometry requirements in accordance with worksite procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is checked for compliance with acceptance standards for spacing, skew and geometry

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required documentation procedures and processes are confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is filled in legibly and proofread

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is processed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Worksite is identified

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Installation, replacement or repair method is selected to meet work requirements in accordance with worksite standards and procedures

1.4

Plant, equipment and materials are prepared for work

2

Restore track gauge

2.1

Equipment and tools appropriate to task are selected and checked for correct operation in accordance with manufacturer instructions and workplace procedures

2.2

Track gauge is restored as required, using appropriate methods in accordance with worksite standards and procedures

2.3

Track gauge measurements are recorded in accordance with workplace procedures

3

Install or replace sleeper

3.1

Unserviceable sleepers are extracted as required, using manual or mechanical methods in accordance with worksite procedures

3.2

New sleeper is installed using manual or mechanical methods in accordance with worksite procedures

3.3

Sleeper plates are installed on relevant sleeper types in accordance with worksite procedures

3.4

Sleeper is suitably packed or supported by appropriate methods in accordance with worksite procedures

3.5

Work is completed to meet track geometry requirements in accordance with worksite procedures

3.6

Work is checked for compliance with acceptance standards for spacing, skew and geometry

4

Complete documentation

4.1

Required documentation procedures and processes are confirmed

4.2

Documentation is filled in legibly and proofread

4.3

Documentation is processed in accordance with workplace procedures

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare for work

1.1

Worksite is identified

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Installation, replacement or repair method is selected to meet work requirements in accordance with worksite standards and procedures

1.4

Plant, equipment and materials are prepared for work

2

Restore track gauge

2.1

Equipment and tools appropriate to task are selected and checked for correct operation in accordance with manufacturer instructions and workplace procedures

2.2

Track gauge is restored as required, using appropriate methods in accordance with worksite standards and procedures

2.3

Track gauge measurements are recorded in accordance with workplace procedures

3

Install or replace sleeper

3.1

Unserviceable sleepers are extracted as required, using manual or mechanical methods in accordance with worksite procedures

3.2

New sleeper is installed using manual or mechanical methods in accordance with worksite procedures

3.3

Sleeper plates are installed on relevant sleeper types in accordance with worksite procedures

3.4

Sleeper is suitably packed or supported by appropriate methods in accordance with worksite procedures

3.5

Work is completed to meet track geometry requirements in accordance with worksite procedures

3.6

Work is checked for compliance with acceptance standards for spacing, skew and geometry

4

Complete documentation

4.1

Required documentation procedures and processes are confirmed

4.2

Documentation is filled in legibly and proofread

4.3

Documentation is processed in accordance with workplace procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant workplace procedures

completing relevant documentation

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

installing or replacing sleepers

interpreting and following operational instructions and following scheduled work processes

modifying activities depending on operational contingencies, risk situations and environments

operating and adapting to differences in equipment in accordance with operating procedures

preparing for installation of railway sleepers

reporting and/or rectifying identified problems, faults or malfunctions, in accordance with workplace procedures

restoring track gauge and geometry

selecting and using relevant tools and equipment

working systematically with required attention to detail without injury to self or others, or damage to equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

contents of relevant workplace technical manuals and instructions

defects that can occur in sleepering tools and equipment, and related action that should be taken

hazards that may exist when installing railway sleepers and ways of controlling the risks involved

problems that may occur when installing railway sleepers and action that can be taken to report or resolve these problems

relevant recording and documentation procedures

relevant safety, work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

sleeper and bearer condition and placement rail industry standards

sleeper and bearer specification and capacity

track gauge measurements

types of tools and equipment that may be used when installing railway sleepers, and their applications

workplace procedures for installing railway sleepers and turnout bearers.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.