NTISthis.com

Evidence Guide: TLIS3009 - Install mechanical signalling locking and interlocking devices

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIS3009 - Install mechanical signalling locking and interlocking devices

What evidence can you provide to prove your understanding of each of the following citeria?

Assemble components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct components are identified and selected to comply with job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and components are pre-assembled and positioned for installation in compliance with work orders and job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install equipment and components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment/component layout is prepared and checked to ensure position matches job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All fastening positions are marked and drilled for installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and components are secured in correct sequence and position in compliance with job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Additional requirements or alterations to existing components are identified and appropriate follow-up action is taken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manufacturing of additional components is carried out to allow for complete installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Alterations to existing components are carried out to provide for the installation of new equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All interlinking components are correctly attached and secured ready for testing in compliance with work specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test and adjust equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required authorisation for tests is confirmed to ensure safe train operations may continue

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test procedures are coordinated and liaison with appropriate personnel is maintained to ensure overall safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate tests are carried out to ensure all operations are within specifications and appropriate adjustments are made to ensure smooth operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Testing is carried out to ensure functionality of all operations to the locking table

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operational readiness is confirmed and required documentation/certification is correctly completed and processed to allow for commissioning

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Assemble components

1.1

Correct components are identified and selected to comply with job specifications

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Equipment and components are pre-assembled and positioned for installation in compliance with work orders and job specifications

2

Install equipment and components

2.1

Equipment/component layout is prepared and checked to ensure position matches job specifications

2.2

All fastening positions are marked and drilled for installation

2.3

Equipment and components are secured in correct sequence and position in compliance with job specifications

2.4

Additional requirements or alterations to existing components are identified and appropriate follow-up action is taken

2.5

Manufacturing of additional components is carried out to allow for complete installation

2.6

Alterations to existing components are carried out to provide for the installation of new equipment

2.7

All interlinking components are correctly attached and secured ready for testing in compliance with work specifications

3

Test and adjust equipment

3.1

Required authorisation for tests is confirmed to ensure safe train operations may continue

3.2

Test procedures are coordinated and liaison with appropriate personnel is maintained to ensure overall safety

3.3

Appropriate tests are carried out to ensure all operations are within specifications and appropriate adjustments are made to ensure smooth operation

3.4

Testing is carried out to ensure functionality of all operations to the locking table

3.5

Operational readiness is confirmed and required documentation/certification is correctly completed and processed to allow for commissioning

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Assemble components

1.1

Correct components are identified and selected to comply with job specifications

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Equipment and components are pre-assembled and positioned for installation in compliance with work orders and job specifications

2

Install equipment and components

2.1

Equipment/component layout is prepared and checked to ensure position matches job specifications

2.2

All fastening positions are marked and drilled for installation

2.3

Equipment and components are secured in correct sequence and position in compliance with job specifications

2.4

Additional requirements or alterations to existing components are identified and appropriate follow-up action is taken

2.5

Manufacturing of additional components is carried out to allow for complete installation

2.6

Alterations to existing components are carried out to provide for the installation of new equipment

2.7

All interlinking components are correctly attached and secured ready for testing in compliance with work specifications

3

Test and adjust equipment

3.1

Required authorisation for tests is confirmed to ensure safe train operations may continue

3.2

Test procedures are coordinated and liaison with appropriate personnel is maintained to ensure overall safety

3.3

Appropriate tests are carried out to ensure all operations are within specifications and appropriate adjustments are made to ensure smooth operation

3.4

Testing is carried out to ensure functionality of all operations to the locking table

3.5

Operational readiness is confirmed and required documentation/certification is correctly completed and processed to allow for commissioning

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

adapting to differences in equipment in accordance with operating procedures

applying relevant legislation and workplace procedures

assembling interlinking components

checking and confirming compliance with operational specifications

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

implementing contingency plans

interpreting and following operational instructions and prioritising work

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

reading and interpreting relevant instructions, procedures, information, technical data and drawings

reporting and/or rectifying identified problems, faults or malfunctions, in accordance with workplace procedures

testing and adjusting close tolerance mechanically operating equipment when installing mechanical signalling locking and interlocking devices

using hand, portable, power and air tools in accordance with workplace procedures

working collaboratively with others when installing mechanical signalling locking and interlocking devices

working systematically with required attention to detail without injury to self or others, or damage to goods or equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

applicable state/territory legislated rail safety requirements, relevant codes of practice and/or guidelines

fault finding techniques

hazards that may exist when installing mechanical signalling locking and interlocking devices, and ways of controlling the risks

machining techniques

safety data sheets (SDSs)/material safety data sheets (MSDSs)

mechanical fitting techniques

problems that may occur when installing mechanical signalling locking and interlocking devices and action that can be taken to report or resolve these problems

rail industry standards for installing mechanical signalling locking and interlocking devices

relevant mechanical theory and principles

relevant rail danger zones

relevant work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

relevant recording and documentation procedures

workplace procedures for installing mechanical signalling locking and interlocking devices.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.