Evidence Guide: TLIS3037 - Install and repair rail earthworks

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIS3037 - Install and repair rail earthworks

What evidence can you provide to prove your understanding of each of the following citeria?

Determine job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Underground services are identified as required and marked to protect services from excavation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work method is selected to meet job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources are organised to meet the scope of the job and selected work methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake trenching

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is prepared for trenching

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavation is undertaken along or across track to accommodate services in accordance with design and organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable materials and methods are used to backfill trench in accordance with design and organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish track formation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavation is undertaken to establish base for formation in accordance with design

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excavated material is removed from worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable materials and methods are used to construct new track formation in accordance with design and organisational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish and maintain minor trackside earthworks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trackside earthworks are constructed or repaired using appropriate equipment in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grading and/or compaction are carried out using appropriate equipment, and care is taken to maintain correct drainage and to protect the environment, trackside installations, fences and underground cabling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required documentation procedures and processes are confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is filled in legibly and proofread

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is processed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Worksite is identified

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Underground services are identified as required and marked to protect services from excavation

1.4

Work method is selected to meet job requirements

1.5

Resources are organised to meet the scope of the job and selected work methods

2

Undertake trenching

2.1

Worksite is prepared for trenching

2.2

Excavation is undertaken along or across track to accommodate services in accordance with design and organisational procedures

2.3

Suitable materials and methods are used to backfill trench in accordance with design and organisational procedures

3

Establish track formation

3.1

Excavation is undertaken to establish base for formation in accordance with design

3.2

Excavated material is removed from worksite

3.3

Suitable materials and methods are used to construct new track formation in accordance with design and organisational procedures

4

Establish and maintain minor trackside earthworks

4.1

Trackside earthworks are constructed or repaired using appropriate equipment in accordance with workplace procedures

4.2

Grading and/or compaction are carried out using appropriate equipment, and care is taken to maintain correct drainage and to protect the environment, trackside installations, fences and underground cabling

5

Complete documentation

5.1

Required documentation procedures and processes are confirmed

5.2

Documentation is filled in legibly and proofread

5.3

Documentation is processed in accordance with workplace procedures

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Worksite is identified

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Underground services are identified as required and marked to protect services from excavation

1.4

Work method is selected to meet job requirements

1.5

Resources are organised to meet the scope of the job and selected work methods

2

Undertake trenching

2.1

Worksite is prepared for trenching

2.2

Excavation is undertaken along or across track to accommodate services in accordance with design and organisational procedures

2.3

Suitable materials and methods are used to backfill trench in accordance with design and organisational procedures

3

Establish track formation

3.1

Excavation is undertaken to establish base for formation in accordance with design

3.2

Excavated material is removed from worksite

3.3

Suitable materials and methods are used to construct new track formation in accordance with design and organisational procedures

4

Establish and maintain minor trackside earthworks

4.1

Trackside earthworks are constructed or repaired using appropriate equipment in accordance with workplace procedures

4.2

Grading and/or compaction are carried out using appropriate equipment, and care is taken to maintain correct drainage and to protect the environment, trackside installations, fences and underground cabling

5

Complete documentation

5.1

Required documentation procedures and processes are confirmed

5.2

Documentation is filled in legibly and proofread

5.3

Documentation is processed in accordance with workplace procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant workplace procedures

determining environmental protection requirements as required

interpreting and following operational instructions and prioritising work

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

reading and interpreting relevant plans

repairing minor trackside earthworks including grading and compaction

reporting and rectifying within limits of own role, identified problems, faults and malfunctions

selecting and using relevant tools and equipment

selecting appropriate safe work methods

working systematically with required attention to detail without injury to self or others, or damage to equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

causes of defects, such as erosion and water scouring

characteristics of relevant plant and equipment, hardware and components used in earthwork activities

environmental protection requirements relating to installing and repairing rail earthworks

functions and design principles of track formation and earthworks

hazardous situations and related personal protection measures

hazards that may exist when installing and repairing rail earthworks, and ways of controlling the risks involved

information in relevant workplace technical manuals and instructions

problems that may occur when installing and repairing rail earthworks, and action that can be taken to report or resolve these problems

relevant recording and documentation procedures

relevant safety, work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

required rail industry standards for materials and the methods involved in installing and repairing rail earthworks

workplace procedures for installing and repairing rail earthworks.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.