NTISthis.com

Evidence Guide: TLIW2039 - Place and remove permanent way stop boards

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIW2039 - Place and remove permanent way stop boards

What evidence can you provide to prove your understanding of each of the following citeria?

Place track protection signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Location advice for track protection signage is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant Network Control Officer is contacted and informed as required in accordance with network owner’s policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is placed in accordance with network owner’s rail industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant personnel are notified that track protection signage has been placed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove track protection signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Location advice for removal of track protection signage is confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant Network Control Officer is contacted and informed, in accordance with network owner’s policies and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is removed from track, and secured and stowed appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant personnel are notified that track protection signage has been removed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Place track protection signage

1.1

Location advice for track protection signage is confirmed

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Relevant Network Control Officer is contacted and informed as required in accordance with network owner’s policies and procedures

1.4

Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures

1.5

Equipment is placed in accordance with network owner’s rail industry standards

1.6

Relevant personnel are notified that track protection signage has been placed

2

Remove track protection signage

2.1

Location advice for removal of track protection signage is confirmed

2.2

Hazards are identified, risks are assessed and control measures are implemented

2.3

Relevant Network Control Officer is contacted and informed, in accordance with network owner’s policies and procedures

2.4

Equipment is removed from track, and secured and stowed appropriately

2.5

Relevant personnel are notified that track protection signage has been removed

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Place track protection signage

1.1

Location advice for track protection signage is confirmed

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Relevant Network Control Officer is contacted and informed as required in accordance with network owner’s policies and procedures

1.4

Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures

1.5

Equipment is placed in accordance with network owner’s rail industry standards

1.6

Relevant personnel are notified that track protection signage has been placed

2

Remove track protection signage

2.1

Location advice for removal of track protection signage is confirmed

2.2

Hazards are identified, risks are assessed and control measures are implemented

2.3

Relevant Network Control Officer is contacted and informed, in accordance with network owner’s policies and procedures

2.4

Equipment is removed from track, and secured and stowed appropriately

2.5

Relevant personnel are notified that track protection signage has been removed

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant safeworking systems and workplace procedures

communicating effectively with individuals and groups

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

reading and interpreting Rail Infrastructure Manager procedures for placing and removing track protection signage

using track protection signage in accordance with required Rail Infrastructure Manager rail industry standards

working within the available timeframes for the work function in accordance with workplace safeworking procedures.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

hazards that can exist when placing and removing track protection signage

Rail Infrastructure Manager/network owner’s procedures for placing and removing track protection signage

relevant rail danger zones.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.