The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan to assemble, mount and connect control gear and switchgear
|
|
Switchgear and control gear assembly installation is determined and planned in accordance with job specifications, wiring and schematic diagrams Completed |
Evidence:
|
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied |
|
Completed |
Evidence:
|
Work instructions, including layout and wiring diagrams, are applied in accordance with workplace procedures |
|
Completed |
Evidence:
|
Advice is sought from supervisor to ensure work is coordinated effectively with relevant person/s |
|
Completed |
Evidence:
|
Materials required for the control gear and switchgear installation work are obtained in accordance with workplace procedures |
|
Completed |
Evidence:
|
Tools, equipment and measuring devices required to carry out work are obtained and checked for correct operation and safety |
|
Completed |
Evidence:
|
Assemble, mount and connect control gear and switchgear
|
|
Switchgear and control gear assembly hazards are identified, risks assessed and control measures are implemented in accordance with workplace procedures Completed |
Evidence:
|
Circuits are checked and isolated in accordance with WHS/OHS workplace requirements and procedures |
|
Completed |
Evidence:
|
Component layout is in accordance with job specifications, wiring and schematic diagrams |
|
Completed |
Evidence:
|
Switchgear/control gear is fitted in accordance with work instructions, industry standards, manufacturer specifications and workplace procedures |
|
Completed |
Evidence:
|
Interconnections are made in accordance with work instructions, industry standards and workplace procedures |
|
Completed |
Evidence:
|
Regular quality checks are carried out in accordance with workplace procedures |
|
Completed |
Evidence:
|
Completed switchboard function is tested in accordance with workplace procedures, industry standards and manufacturer specifications |
|
Completed |
Evidence:
|
Labelling and numbering cable are undertaken in accordance with industry standards, wiring and schematic diagrams |
|
Completed |
Evidence:
|
Unplanned events are referred to supervisor for directions in accordance with workplace procedures |
|
Completed |
Evidence:
|
Assembly work is carried out without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy practices |
|
Completed |
Evidence:
|
Finalise and inspect assembled control gear and switchgear installation
|
|
Assembled switchboard panel is visually inspected and checked against work instructions, industry standards and manufacturer specifications in accordance with workplace procedures Completed |
Evidence:
|
Problem-solving techniques are used where corrective actions to assembled components are required in accordance with regulatory requirements and industry standards |
|
Completed |
Evidence:
|
Work completion is documented and relevant person/s notified in accordance with workplace procedures |
|
Completed |
Evidence:
|