NTISthis.com

Evidence Guide: UEECD0013 - Develop and implement energy sector maintenance programs

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEECD0013 - Develop and implement energy sector maintenance programs

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare maintenance requirements for energy sector

  1. Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risk control measures and workplace procedures in preparation for the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS and workplace procedures are developed for required practice skills, frequency and level of maintenance work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance program is determined from plant performance specifications and in consultation with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant person/s is engaged to assess the risks with individual equipment failure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Level and frequency of repair/replacement for maintenance work is identified following manufacturer instructions in accordance with WHS/OHS and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Systems to manage and record maintenance work are identified in accordance with workplace procedures and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop and implement maintenance program

  1. Schedules detailing maintenance levels and frequency for equipment items are developed in accordance with risk assessment reports and manufacturer instructions
Schedules detailing maintenance levels and frequency for equipment items are developed in accordance with risk assessment reports and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace procedures for the maintenance program are developed and implemented in accordance with workplace schedule and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace procedures for records to be maintained are developed and implemented in accordance with workplace schedule and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance program is documented in accordance with relevant industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate maintenance program

  1. Periodic and sample inspection reports are used for maintenance quality and revision of maintenance schedule and frequency in accordance with workplace procedures
Periodic and sample inspection reports are used for maintenance quality and revision of maintenance schedule and frequency in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance schedule is reviewed and revised to maintain equipment to acceptable level in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including:

using risk control measures

determining the maintenance program from specifications and relevant person/s

developing a maintenance record system

developing maintenance schedule implementation procedures

developing maintenance program and evaluation procedures

documenting the maintenance program

identifying the level and frequency of repair/replacement maintenance

preparing maintenance requirements.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

relevant equipment

relevant industry standards

relevant maintenance principles

relevant maintenance systems maintenance plan

relevant manufacturer specifications and operating instructions

relevant plant performance specifications

relevant review of maintenance plan

relevant job safety assessments or risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation, including:

periodic and sample inspection reports

relevant workplace quality, instructions, policies and procedures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Developing and implementing energy sector maintenance programs must include producing one workplace maintenance program and include at least ten different types of items included in the schedule:

elements or variables included in the schedule