The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to lay wiring/cabling and connect accessories for ELV circuits
|
|
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures are identified and applied Completed |
Evidence:
|
Hazards are identified, risks are assessed and control measures are implemented |
|
Completed |
Evidence:
|
Safety hazards not previously identified are reported on job safety assessment and advice on risk control measures is sought from the work supervisor |
|
Completed |
Evidence:
|
Location of work is obtained from relevant person/s to determine scope of work |
|
Completed |
Evidence:
|
Advice is sought from relevant person/s to ensure work is coordinated with others |
|
Completed |
Evidence:
|
Sources of materials required for work are determined in accordance with workplace procedures |
|
Completed |
Evidence:
|
Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Lay wiring/cabling and connect accessories for ELV circuits
|
|
WHS/OHS workplace risk control measures for carrying out the work are followed Completed |
Evidence:
|
Circuits/machines/plant are checked as isolated in accordance with workplace procedures |
|
Completed |
Evidence:
|
Wiring and accessories are installed to comply with industry standards and job specifications with sufficient excess to affect terminations |
|
Completed |
Evidence:
|
Accessories are installed straight and square in the required locations and within acceptable tolerances |
|
Completed |
Evidence:
|
Cables and conductors are terminated at accessories in accordance with manufacturer specifications and relevant industry standards |
|
Completed |
Evidence:
|
Cables installed for future service are marked and terminated in compliance with relevant industry standards and workplace procedures |
|
Completed |
Evidence:
|
Unplanned events are responded to in accordance with workplace procedures and approval of immediate supervisor |
|
Completed |
Evidence:
|
Cable installation and termination is carried out without wasting materials, damaging apparatus, circuits or the surrounding environment using sustainable energy practices |
|
Completed |
Evidence:
|
Complete and report work activity
|
|
WHS/OHS completion risk control measures and workplace procedures are followed Completed |
Evidence:
|
Worksite is cleaned and made safe in accordance with workplace procedures |
|
Completed |
Evidence:
|
Work completion is documented and relevant person/s notified in accordance with workplace procedures |
|
Completed |
Evidence:
|