NTISthis.com

Evidence Guide: UEEDV0003 - Install and connect cabling for direct access to telecommunications service

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEDV0003 - Install and connect cabling for direct access to telecommunications service

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to lay and connect cabling for direct access to telecommunication services

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risks are identified and risk control measures and workplace procedures are followed in preparation for the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remote power feeding is identified and risk control measures prepared

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work is determined from documentation and/or discussions with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable routes are planned within the constraints of the building structure, significants and regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Earthing requirements are determined with existing earthing arrangements and cable system earth upper and lower resistance limitations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from relevant person/s to ensure work is coordinated effectively with others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sources of materials required for work are checked in accordance with routines and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices required to carry out work are obtained and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay and connect cabling for direct access to telecommunication services

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installed support structure is checked to ensure cable is protected against damage during installation and general operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sufficient excess is allowed at cable ends to facilitate termination

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Telecommunication outlet ends of cable are uniquely labelled to match identifier at originating location in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable is placed and secured to maintain safety and interference segregation in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable ties are tightened without damage to cable sheath or transmission impairment and trimmed flush in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables are installed as catenaries or supported by catenaries in internal and external environment to meet above ground clearances and clearances from hazardous electrical services in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables are installed underground to meet depth of cover and segregation from hazardous electrical and relevant services in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Over-voltage protection devices are fitted to all cable pairs, as required, to suppress voltage surges with devices protectively earthed in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Telecommunications reference conductor (TRC)/communications earth system (CES)/earth wire insulation is protected and segregated against damage in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace procedures for referring unplanned events to immediate supervisor for directions are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cabling is installed without waste of materials, energy, services, damage to apparatus and the surrounding environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks are carried out to ensure cabling is in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate, inspect and test cables and earth wires

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable sheath is removed to allow for correct termination length without damage to underlying conductors and relevant insulation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Network termination device is installed and cable pairs sequentially fanned for termination in accordance with manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conductors are terminated with colour code sequence using relevant termination tools in accordance with manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable shield is earthed in accordance with manufacturer specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Visual inspection is conducted to confirm termination colour code sequence prior to end-to-end testing of wire and pair termination integrity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable pairs are inspected, tested and labelled to provide accurate identification in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

TRC/CES/earth wires are terminated with connectors in accordance with relevant industry standards and manufacturer specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

TRC/CES/earth wire continuity is maintained throughout and interface requirements and electrical systems are observed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

TRC/CES/earthing installation is inspected and tested for continuity, insulation resistance and conductive resistance in accordance with industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compatibility of alterations with existing systems and new work is confirmed and tested in isolation and integrated with existing systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cabling is terminated without waste of materials, energy and/or damage to apparatus, the surrounding environment and/or services

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks are carried out and defects rectified to ensure cabling is in accordance with workplace procedures and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete cabling work records and reporting

  1. WHS/OHS work completion risk control measures and workplace procedures are followed
WHS/OHS work completion risk control measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cabling completion advice is documented and reported in accordance with workplace procedures and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

terminating at both network termination device and at least two different outlet types and locations

placing of cables on support structures and building faces for both internal and external locations

securing cables correctly for above locations

avoiding cable damage such as crushing, burning, kinking, sheath twist, cutting and nicking, and bending radius

reading and interpreting drawings related to outlet and service entry location

conducting and interpreting cable test results

correctly interpreting and applying standards and regulations

completing the required documentation

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control methods

completing cabling work records and reporting

inspecting and testing cables and earth wires

installing support structure against damage during installation and general operation

installing cable without waste of materials, energy, services, damage to apparatus and the surrounding environment

labelling telecommunication outlet ends of cable

laying and connecting cabling for direct access to telecommunication services

obtaining and checking tools, equipment and testing devices

preparing cabling for direct access to telecommunication services

terminating cables and earth wires

terminating telecommunications reference conductor (TRC)/communications earth system (CES)/earth wires.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

telecommunications restricted cabling provider rules (CPR) regulations and installations, safe working practices and relevant standards, codes and regulations, including:

telecommunication industry overview encompassing:

telecommunication industry

overview of telecommunications network

overview of Telecommunications Act 1997

role of Australian Communications Media Authority (ACMA) and ACIF

telecommunications terminology

telecommunication technical standards encompassing:

ACMA Technical Standards TS008 and TS009

SAA Communications Cabling Manual (restricted) (starter kit) as approved by relevant bodies – Standards Australia/ACIF

international standards – ISO, IEC and ITU

Building Code of Australia (BCA)

AS/NZS 3000

National Association of Testing Authorities (NATA)

CPR encompassing:

ACMA

telecommunications CPR

CPR registration

old telecommunication licensing structures

inspection of work

documentation – TCA1 form

cable type and identification encompassing:

cable types – unshielded twisted pair, shielded twisted pair, indoor, underground and aerial

cable construction

cable identification – codes (colour, banded, numbered and lettered)

cable installation encompassing:

cable damage

cable packaging

cable dispensing devices

cable insertion and hauling

lead-in conduit requirements (including wall box installation)

wiring diagrams

segregation of cables

aerial cable fittings and additional safety aspects required

termination of telecommunication cables encompassing:

sheath stripping – methods and precautions

pair identification

end-to-end testing

filled cable termination

termination systems – telephone outlets and sockets, and network terminating devices (NTD)

connector jointing e.g. external to internal cable where required

telecommunication earthing and protection encompassing:

customer lightning protection (CLP)

CLP earthing

carrier’s policy requirement covering materials (including surge suppression devices) and

practices (including earth bonding arrangements)

basic telephony encompassing:

basic telephone service

telephone

exchange number

connection equipment/lead-in cable

dialling signals – pulse dialling, tone dialling and ring equivalence number (REN)

problem-solving techniques

relevant earthing requirements

relevant industry standards

relevant manufacturer specifications and operating instruction

relevant job safety assessments or risk mitigation processes

relevant tools, equipment and testing devices

relevant TRC/CES/earth wires

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace quality, policies and procedures.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Cabling installations must include at least the following:

single telephone line (two-pair) and directly connected to telephone sockets