The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEDV0004 - Install and connect data and voice communication equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install communications equipment

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation of communications equipment is prepared in consultation with others and sequenced appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work is determined from documentation and/or discussion with relevant person/s for work to be undertaken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Location of communications equipment and associated equipment is planned within the constraints of the building structure, significants and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from relevant person/s to ensure the work is coordinated effectively with others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material needed for the installation work is obtained in accordance with workplace procedures and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices required for installation work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preparatory work is checked to ensure no damage has occurred in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install communications equipment

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communications equipment tests are carried out in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communications equipment is installed with sufficient access to affect terminations, adjustments and maintenance in accordance with job requirements and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cabling is terminated at communications equipment in accordance with manufacturer requirements and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Methods for dealing with unplanned situations are discussed with relevant person/s for approval and documented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are dealt with safely and with the approval of an authorised person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks of the installed communications equipment are conducted in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communications equipment installation is carried out efficiently without waste of materials or damage to communications equipment, circuits, surrounding environment and/or services using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and report installation activities

  1. WHS/OHS work completion risk control measures and procedures are followed
WHS/OHS work completion risk control measures and procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final checks are made to ensure that the installed communications equipment is in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

‘As-installed’ communications equipment is documented and relevant person/s notified in accordance with workplace procedures and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures

carrying out communications equipment installation without waste of materials or damage to communications equipment, circuits, surrounding environment and/or services using sustainable energy principles

completing and reporting installation activities

completing required documentation

connecting communications equipment

dealing with unplanned events

dealing with unplanned situations

installing communications equipment and associated equipment

installing communications equipment with sufficient access to affect terminations, adjustments and maintenance

obtaining and checking tools, equipment and testing devices

placing and securing communications equipment accurately

planning location of communications equipment and associated equipment

preparing to install communications equipment and associated equipment

terminating cabling

testing communications equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

analogue and digital signals

basics of encoding networking signals

internet services

local area network (LAN) architectures

network signal propagation

networking protocols and the open systems interconnection (OSI) model

problem-solving techniques

relevant building structure and significants

relevant industry standards

relevant manufacturer specifications and operating instructions

relevant job safety assessments or risk mitigation processes

relevant tools, equipment and testing devices

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace quality, policies and procedures

sustainable energy principles

transmission control protocol (TCP)/internet protocol (IP)

types of networks, network components and hardware.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Installing and connecting must include the following:

at least three different types of voice and data communications equipment

at least three types of communications cable