NTISthis.com

Evidence Guide: UEEDV0006 - Install and modify optical fibre performance data communication cabling

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEDV0006 - Install and modify optical fibre performance data communication cabling

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install and modify optical fibre cabling

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation and modification of wiring is prepared in consultation with others and sequenced appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work is determined from documentation and/or discussions with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from relevant person/s to ensure work is coordinated effectively with others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material required for the installation work is obtained in accordance with workplace procedures and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices required for the installation work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preparatory work is checked to ensure no damage has occurred and is in accordance with workplace procedures and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and modify optical fibre cables

  1. WHS/OHS risk control measures and workplace procedures for carrying out work are followed
WHS/OHS risk control measures and workplace procedures for carrying out work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Optical fibres are tested for optical continuity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables are installed and modified with sufficient excess to affect terminations in accordance with manufacturer specifications, relevant industry standards and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Methods for dealing with unplanned situations are discussed with relevant person/s for approval and documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are dealt with safely and with the approval of relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks of the installed wiring are conducted in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable installation and modification is conducted without waste of materials, damage to apparatus, circuits or surrounding environment using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate optical fibre cables

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable termination work area and optical fibre cables are cleaned and safety measures implemented in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables are prepared for termination in accordance with manufacturer specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Optical fibre connectors are fitted in accordance with manufacturer specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relevant methods are used to splice optical fibre cables in accordance with WHS/OHS requirements, manufacturer specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable performance tests are conducted and results documented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Causes of defects indicated by test results are identified and rectified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable terminations are completed without waste of materials, damage to apparatus, circuits or surrounding environment using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document installation and modification and verify optical fibre cabling performance

  1. WHS/OHS work completion risk control measures and workplace procedures are followed
WHS/OHS work completion risk control measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final checks to the installed cabling are conducted in accordance with job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation certifying system performance is issued to a relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including applying risk control measures

completing documentation

conducting cable performance tests and documenting results

dealing with unplanned events

documenting installation and modification and verifying optical fibre cabling performance

identifying and rectifying anomalies

identifying and rectifying defects

installing and modifying optical fibre cables

obtaining and checking tools, equipment and testing devices

preparing and terminating each type of cable in accordance with relevant industry standards

preparing to install and modify optical fibre cabling

routing, placing and securing cables in accordance with relevant industry standards

terminating cable in accordance with manufacturer specifications and relevant industry standards

terminating optical fibre cables

testing optical fibres for optical continuity.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

building construction and building codes

installation and modification

installation of cables

optical fibre principles of operation

optical fibre safety - hazards

optical fibre safety - laser

optical theory

problem-solving techniques

relevant industry standards

relevant manufacturer specifications and operating instructions

relevant job safety assessments or risk mitigation processes

relevant tools, equipment and testing devices

relevant WHS/OHS legislated requirements, including risk management principles

relevant workplace documentation, including administration and management records

relevant workplace quality, policies and procedures

support structures and fixings

sustainable energy principles

terminating of fibre cables

testing of optical fibre cables.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Installing or modifying cabling must include at least two of the following:

performance optical fibre cables