NTISthis.com

Evidence Guide: UEEDV0007 - Install underground communication cables

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEDV0007 - Install underground communication cables

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install underground communication cables

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risks are identified, and risk control measures and workplace procedures are followed in preparation for the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety hazards that have not previously been identified are noted and risk control measures implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cabling installation is prepared in consultation with others affected by the work and sequenced in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of the work is determined from documentation and/or discussions with relevant person/s to establish the work to be undertaken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable routes are planned in accordance with the precinct, structure, significants and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from relevant person/s to ensure the work is coordinated effectively with others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material required for installation work is obtained in accordance with workplace procedures and job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices required for the installation work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preparatory work is checked to ensure no damage has occurred in accordance with job specifications requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install underground communication cables

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trenching is checked in accordance with job specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ducts/conduits are laid in accordance with job specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables are drawn-in without stain or damage in accordance with job specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable ends are protected from damage in preparation for termination

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Methods for dealing with unplanned situations are discussed with relevant person/s for approval and documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are dealt with safely and with the approval of relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks of the installed wiring are undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable installation is carried out efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document and verify installation of underground communication cables

  1. WHS/OHS work completion risk control measures and workplace procedures are followed
WHS/OHS work completion risk control measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation of cable installation is completed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

reading and interpreting drawings related to cable schedules and routes

installing ducts/conduits below ground correctly

drawing in cables without strain or damage

protecting cable ends

completing the necessary documentation accurately

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures

carrying out cable installation efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment using sustainable energy practices

checking trenching in accordance with job specifications and relevant industry standards

documenting and verifying installation of underground communication cables

installing underground communication cables

obtaining material required for installation work

obtaining tools, equipment and testing devices required for the installation work and checking for correct operation and safety

preparing to install underground communication cables.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

telecommunication underground cabling requirements and techniques, safe working practices and relevant standards, codes and regulations, including:

hazards and control measures in underground cabling working environment:

risk management and assessment of risk:

principle and purpose of risk management

processes for conducting a risk assessment

hazards associated with low voltage (LV), extra-low voltage (ELV) and high currents:

parts of an electronic systems and equipment that operate at LV and ELV

parts of an electronic systems and equipment where high currents are likely

risks and control measures associated with high voltage (HV):

parts of an electronic systems and equipment that operate at HV

the terms ‘touch voltage’, ‘step voltage’, ‘induced voltage’ and ‘creepage’ as they relate to the hazards of HV

control measures used for dealing with the hazards of HV

risks and control measures associated with LV:

risks associated with installation, fault finding, maintenance and repair

control measures before, while and after working on electronic systems or equipment

isolation and tagging-off procedures

risks and restrictions in working live

control measures for working live

risks and control measures associated with trenches:

identification of trenching conditions

notification of relevant authorities/utilities and permits

digging and trenching equipment safety

methods of shoring

public safety

personal safety equipment

telecommunication below ground cabling:

types and purposes of mechanical and manual aids

purpose, location, and capacity of manholes and pits

types of underground cable

procedure for the excavation of a site for the installation of a manhole, pit, pipe and conduit

problem-solving techniques

relevant manufacturer specifications and operating instructions

relevant tools, equipment and testing devices

relevant workplace documentation

relevant workplace quality, policies and procedures

sustainable energy practices.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.