Evidence Guide: UEEDV0008 - Install, modify and verify coaxial and structured communication copper cabling

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEDV0008 - Install, modify and verify coaxial and structured communication copper cabling

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install and/or modify copper cabling

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation or modification of wiring is coordinated after consultation with relevant person/s affected by the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Nature and location of work is obtained from relevant person/s and/or documentation, diagrams, cable layout drawings and cable schedules to determine the scope and details of work to be undertaken

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable routes are planned in accordance with relevant regulations, constraints of the building structure, fire walls, cultural/heritage requirements and regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from relevant person/s to ensure work is coordinated effectively with others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material required for the installation work is determined and obtained in accordance with workplace procedures and checked against job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices required for the installation are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preparatory work is checked to ensure compliance with regulations, workplace procedures, safety and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install or modify copper cables

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables are installed or modified with sufficient excess to affect terminations in accordance with manufacturer specifications, technical standards and job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable installation/modification is carried out without waste of materials or damage to apparatus, circuits or the surrounding environment and using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate copper cables

  1. WHS/OHS risk control measures and procedures for work completion are followed
WHS/OHS risk control measures and procedures for work completion are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable termination work area is cleaned and safety measures implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables are prepared for termination in accordance with manufacturer specifications, technical standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Surge suppression devices are fitted to cables with metallic components in accordance with manufacturer specifications, technical industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable shields are earthed in accordance with manufacturer specifications, technical standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Twist ratio of generic, structured metallic cables is maintained in accordance with manufacturer specifications and technical standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Twisted pair cables are terminated in accordance with manufacturer specifications, technical standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable performance tests are conducted accurately and results documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cause of defects indicated by inspection and test results are identified and rectified in accordance with manufacturer specifications, technical industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Regular quality checks of the installed wiring are undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable terminations are carried out without waste of materials, damage to apparatus, circuits or the surrounding environment and using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Verify and document copper cabling installation and performance

  1. WHS/OHS risk control measures and workplace procedures for work completion are followed
WHS/OHS risk control measures and workplace procedures for work completion are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final checks are made to installed cabling to ensure it conforms to performance requirements and regulations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Telecommunications cabling advice (TCA) forms are completed in accordance with workplace procedures and issued to relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including applying risk control measures

obtaining correct materials, tools and equipment to undertake the work

checking tools, equipment and testing devices for correct operation and safety

installing, terminating and testing unshielded twisted pair (UTP), FTP or shielded twisted pair (STP) customer cables that are rated Category 5 or above

installing, terminating and testing coaxial cable installation systems

installing and modifying performance data communication copper cabling, including:

reading and interpreting drawings and diagrams related to cable layouts, schedules and apparatus locations

routing, placing and securing cables to comply with industry standards

preparing and terminating each type of cable to comply with industry standards

ensuring copper cables are installed or modified with sufficient excess to affect terminations

maintaining twist ratio of generic, structured twisted pair copper cables

earthing cable shields

fitting surge suppression devices

conducting cable performance tests

completing necessary documentation.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

telecommunication cable types, including:

construction

transmission characteristics

applications

cable identification, including:

plans and drawing

labelling

documentation

cable installation, including:

hazards

cable damage prevention

cable dispensers

distributors and distributor enclosures, including:

types

regulations

termination interfaces

termination methods and requirements

category 5 and above generic, structured cabling, including:

design principles

functional elements

cabling sub-systems

uses and construction of category UTP, FTP and STP generic and coaxial structured cabling installation systems

performance requirements for structured cabling, including:

approved practices

safety requirements

connectors

terminating tools

continuity tests

fault diagnosis

recording results

testing and commissioning structured cabling systems

constraints of building structure, fire walls and cultural/heritage requirements

techniques to identify and rectify faults/defects.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Installing, modifying and verifying coaxial and structured communication copper cabling must include:

distributor frames

patch panels

a range connectors/outlets

a range of cable types