Evidence Guide: UEEEL0013 - Install, set up and commission interval metering

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEEL0013 - Install, set up and commission interval metering

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install interval meter

  1. WHS/OHS requirements and workplace procedures, for a given work area, are identified and applied
WHS/OHS requirements and workplace procedures, for a given work area, are identified and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Health and safety hazards are identified, risks assessed and risk control measures and workplace procedures implemented in preparation for the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety hazards not previously identified are noted on job safety assessments and existing risk control measures implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Switchboard on which the meter is to be installed is inspected and evaluated for compliance with safety, functionality and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approval to rectify safety and/or functionality defects of the switchboard is sought from relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Electrical meter installation and/or rectification work is prepared in consultation with relevant person/s effected by the work and sequenced appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials needed for meter work are obtained in accordance with workplace procedures and checked against job requirements and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed for meter work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install interval meter

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Need to test or measure live work is determined in accordance with WHS/OHS requirements and conducted within workplace safety procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Existing meter is checked and isolated in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved rectification work is carried out to comply with industry standards and in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meter is installed to comply with relevant technical industry standards, job specifications and requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meter power and communication connections are made in accordance with manufacturer specifications, functional and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meter operating parameters are set in accordance with manufacturer specifications, functional and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment and with the approval of an authorised person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ongoing checks of the quality of installed apparatus are undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meter installation is carried out efficiently without unnecessary waste of materials or damage to apparatus circuits, the surrounding environment or services using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and report meter installation activity

  1. WHS/OHS work completion risk control measures and workplace procedures are followed and supply is reinstated to the installation in accordance with regulator and industry standards
WHS/OHS work completion risk control measures and workplace procedures are followed and supply is reinstated to the installation in accordance with regulator and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final inspection and tests are made to ensure the installed meter conforms to job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

'As-installed' meter or rectification work is documented and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures and practices, including using of risk control measures

applying sustainable energy principles and practices

completing and reporting meter installation activities

dealing with unplanned events in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

determining prospective fault-current switchboard form types

installing, setting up and commissioning interval electrical meters, including:

carrying out preparation work effectively

documenting meter and rectification work and notifying appropriate person/s in accordance with workplace procedures

following workplace procedures to obtain approval to rectify non-compliance aspects of the switchboard

inspecting and evaluating safety and functionality compliance of the switchboard accurately

locating of switchboards and arrangement of switchboard equipment in installations

making power and communications connections in accordance with manufacturer specifications and functional and regulatory requirements

placing and securing meter correctly

rectifying compliance defects

reinstating supply to the installation safely in accordance with workplace procedures

setting meter parameters in accordance with manufacturer specifications and functional and regulatory requirements

planning to install interval electrical meters.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

current industry practices and technologies

interval meter concepts and installation, including:

classes of meter types, functions, and construction from a block diagram

communication methods and arrangements

importing and exporting energy

installation and power connection arrangements and connections for gas metering

purpose, types and applications

single and polyphase meters and procedures for setting meter parameters

meter layouts and requirements, including:

accessibility and restricted locations of switchboards

arrangement and identification of switchboard equipment

arrangement and installation of meter equipment

construction requirements of switchboards

identification of main switchboards

meter equipment

protection against switchboard internal arc faults

purpose, types and applications

switchboard wiring and fire-protective measures

varying arrangements for meter and meter layouts

reasons for meter and the regulated market, including regulations

relevant industry technical standards

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant state/territory regulator interval metre commissioning requirements and specifications

relevant WHS/OHS legislated and regulation requirements

relevant workplace documentation

relevant workplace policies and procedures

sustainable energy principles and practices.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Installing interval electricity meters must include the following:

a single phase interval meter

a two-way interval meter

an interval meter where compliance rectification work is required