NTISthis.com

Evidence Guide: UEEEL0026 - Align and install traction lift equipment

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEEL0026 - Align and install traction lift equipment

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install lift equipment

  1. WHS/OHS requirements and workplace procedures for a given work area are identified and applied
WHS/OHS requirements and workplace procedures for a given work area are identified and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risk control measures and workplace procedures in preparation for the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work to be undertaken is identified from site plans, drawings, specifications and/or discussions with appropriate person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from work supervisor to ensure work is coordinated effectively with others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and alignment devices needed to carry out work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Align and install lift equipment

  1. WHS/OHS risk control measures and workplace procedures for carrying out work are followed
WHS/OHS risk control measures and workplace procedures for carrying out work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace safety procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is installed straight and square in the required locations and within acceptable tolerances

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is aligned and installed in accordance with manufacturer specifications and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Existing safe work methods for dealing with unplanned situations are discussed with appropriate person/s and documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Checks of the quality of installed equipment are undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment installation is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits or the surrounding environment using sustainable energy practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and report alignment and installation activities

  1. WHS/OHS work completion risk control measures and workplace procedures are followed
WHS/OHS work completion risk control measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final checks are made to ensure that the installed equipment conforms to job specifications and workplace requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

'As-installed' equipment is documented and an appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

aligning and installing traction lift equipment

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures and practices, including using of risk control measures

applying sustainable energy principles and practices

carrying out alignment functions

completing and reporting alignment and installation work activities

dealing with unplanned events in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

planning to align and install traction lift equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

alignment equipment, including rail gauges, straight edges, shims/packers and lasers

car operating devices, including slowdown switch, limits, inductors, door locks, vanes and shaft information

current industry practices, workplace procedures and technologies

equipment layout, including specifications, clearances, 3-D impact on layout and lift code

fixing devices and methods, including inserts and expansion and chemically bonded anchors

installation and alignment of hydraulic equipment, including ram/cylinder, hydraulic lines and bleeding hydraulic system

lift car alignment, including superstructure, frames and doors

lift well alignment, including guides and brackets, trimmer beams, buffers, compensators, landing doors and locks

lift well/s, including lift well alignment

multiple lift wells, including:

corrective action and setting of well templates

plumb charts analysis for 3-D impact

use of theodolite, centre line/datum, survey information and layouts

single lift wells, including:

purpose and need for accuracy, including identification of clearances

modification of errors, including adjustment and use of template

use of plumb lines and weights

measuring and marking out lift wells and machine room, where appropriate

plumbing chart and use of laser level

machine room alignment, including machine and fixings, diverter, governor and tensioning sheaves, counterweight centre lines and roping system

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications and relevant industry standards, including:

traction lift mechanical equipment

traction lift electrical equipment

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies, procedures and instructions

running clearances requirements, including safety gear, car sill and door operator

sustainable energy principles and practices.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Aligning and installing must include at least the following:

two of the following alignments:

lift car alignment

lift well alignment

machine room alignment

two of the following types of equipment:

lift cars

lift well equipment

machine room equipment