NTISthis.com

Evidence Guide: UEEEL0033 - Conduct electrical tests on LV electrical machines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEEL0033 - Conduct electrical tests on LV electrical machines

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to conduct electrical inspections and tests on induction machines

  1. WHS/OHS requirements and workplace procedures for a given work area are identified and applied
WHS/OHS requirements and workplace procedures for a given work area are identified and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Existing WHS/OHS risk control measures for work preparation are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scope of work is determined from job specifications and regulatory requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from the work supervisor to ensure the work is coordinated effectively with others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Winding data is obtained from winding data records or directly from measurements of stator and recorded in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials required for the work are obtained in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct electrical inspections and tests on induction machines

  1. Existing WHS/OHS risk control work measures are followed
Existing WHS/OHS risk control work measures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machines/equipment are inspected, checked and isolated in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Electrical inspection and tests are conducted to establish operational condition of the machine in accordance with workplace procedures and instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Serviceability status of the machine is determined from inspection and test results and recorded

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Electrical testing is completed within timeframe, environment and workplace conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete workplace reports

  1. WHS/OHS work completion risk controls measures are followed
WHS/OHS work completion risk controls measures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Serviceability status of the machine is documented in accordance with workplace procedures and appropriate person/s notified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including identifying safety requirements prior to undertaking electrical tests on low voltage (LV) electrical machines

applying sustainable energy principles and practices

completing workplace reports

conducting electrical inspection and tests LV electrical machines, including:

conducting testing, including continuity, insulation resistance, short circuit and hi-pot on a magnetic circuit

connecting of test/measuring devices into the circuits of LV electrical machines

determining the status of the machine correctly from test results

documenting machine serviceability status clearly

setting up tests correctly

taking inspection and test readings accurately

ensuring circuits are effectively isolated prior to undertaking tests on LV electrical machines

identifying faults in LV machines from data recorded when testing LV electrical machines

planning to conduct electrical inspection and tests on LV electrical machines

taking and interpreting readings from test/measuring devices while undertaking tests on LV electrical machines

using tools safely in accordance with workplace procedures.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

connection of test/measuring devices into a circuit, including safety procedures and circuit arrangement

current industry practices and technologies

electric motor/machine mechanical measuring, inspecting and testing devices and techniques, including:

LV motor/machine inspection and testing devices and techniques

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant safe working practices, including safety procedures when using test/measuring devices

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

storage, maintenance and care of test/measuring devices

sustainable energy principles and practices

taking and interpreting readings for continuity, insulation resistance, and short circuit tests on a magnetic circuit

test/measuring devices and their application, including a multimeter, growler, insulation resistance, continuity and short circuit testers.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Conducting LV electrical machine inspections and tests must include the following:

inspection and testing of at least one machine prior to routine maintenance, overhaul or repair

inspection and testing of at least one machine after routine maintenance, overhaul or repair