Evidence Guide: UEEEL0050 - Install and replace low voltage current transformer metering

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEEL0050 - Install and replace low voltage current transformer metering

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install and replace LV CT metering

  1. WHS/OHS requirements and workplace procedures for a given work area are identified and applied
WHS/OHS requirements and workplace procedures for a given work area are identified and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS hazards are identified, risks are assessed, and control measures are implemented for work preparation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS hazards not previously identified are noted, risks assessed and risk control measures implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Switchboard on which the meter/s and CTs are to be installed, inspected and tested are evaluated for compliance with safety and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Further work instructions for safety and/or functionality defects of the switchboard are sought from appropriate person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation of the meter, sequence and rectification work is prepared in consultation with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material needed for the work is obtained in accordance with workplace procedures and checked against work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed for work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and replace CT metering

  1. WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Need to test and measure live electrical work is determined in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Existing metering is checked and isolated in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved rectification work is carried out to comply with relevant industry standards and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meters and CTs are installed and replaced to comply with relevant industry standards and work specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Metering power, functional requirements and communication connections, as required, are in accordance with manufacturer specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meter operating parameters and functional requirements are in accordance with manufacturer specifications and relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are responded to in accordance with workplace procedures and with the approval of an authorised person in a manner that minimises risk to personnel and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks of the installed apparatus are undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Metering and CT installation is carried out efficiently without unnecessary waste of materials, services, damage to apparatus, circuits or environment using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and report metering installation activities

  1. WHS/OHS work completion risk control measures and procedures are followed and supply is reinstated to the installation is accordance with workplace procedures
WHS/OHS work completion risk control measures and procedures are followed and supply is reinstated to the installation is accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Quality checks of the installed metering and CTs is in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Metering and CT work is documented and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

inspecting and evaluating safety and functionality compliance of the switchboard accurately

following established procedures to obtain approval to rectify non-compliance aspects of the switchboard

carrying out preparation work effectively

rectifying compliance defects

placing and securing metering correctly

making power and communications connections in accordance with manufacturer specifications and functional and regulatory requirements

setting meter parameters in accordance with manufacture's specifications and functional and regulatory requirements

reinstating supply to the installation safely

documenting current transformer(CT) metering and rectification work and notifying appropriate persons in accordance with established procedures

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures

applying sustainable energy practices

completing activities

following quality, workplace procedures and instructions

preparing, installing and replacing CT energy metering

selecting metering and CT components

using tools, equipment, personal protective equipment (PPE) and testing devices

reporting work activities.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

low voltage (LV) CT metering, including:

CTs encompassing:

uses and functions

AS 60044.1-2007 Instrument transformers - Current transformers, requirements

characteristics and saturation

differences between metering and protection CTs

standard ratios and outputs

accurate range of loading

thermal current limit

burden and connecting cable length

short circuiting secondary as a safety issue

accuracy class

revenue meter types used with CTs:

CT installations encompassing:

uses in the regulated market and relevant regulations

types and mounting methods

switchboard layouts (various distributors)

minimum spacing of CTs

connections to single and polyphase revenue meters

consequence of polarity reversal in one phase of a polyphase meter

problem-solving techniques

relevant industry standards

relevant quality workplace procedures

relevant tools, equipment and testing devices

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications and operating instructions

relevant sustainable energy practices

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies, procedures and instructions.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Installing and replacing LV CT must include at least two of the following different installations:

LV CT installation using single phase meters

LV CT installation using a polyphase meter

metering installation where compliance rectification work is required