NTISthis.com

Evidence Guide: UEEEL0067 - Rewind single phase machines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEEL0067 - Rewind single phase machines

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to rewind single phase machines

  1. Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Existing WHS/OHS risk control measures for work preparation are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work instructions are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from work supervisor to ensure the work is coordinated effectively with others

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Winding data is obtained from records or work supervisor in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials required for work are obtained in accordance with technical specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rewind single phase machines

  1. Existing WHS/OHS risk control work measures are followed
Existing WHS/OHS risk control work measures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machines/equipment are checked and isolated in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Single phase machine is dismantled and parts tagged and stored to prevent loss or damage in accordance with workplace procedures and instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Winding is stripped from stator in accordance with workplace procedure and instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stator is wound and insulated in accordance with winding data and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machine is assembled and prepared for inspection and testing in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine quality checks are conducted to ensure electrical coils are correctly wound with correct wire, number of turns and shape in accordance with work instructions and technical specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rewind stators work is completed within timeframe, environment and workplace conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete workplace report

  1. WHS/OHS workplace completion risk control measures are followed
WHS/OHS workplace completion risk control measures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace report, forms/data sheets are completed accurately in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures and practices, including using risk control measures

applying sustainable energy principles and practices

completing work reports

planning to dismantle and wind stators for single phase machines

rewinding single phase induction machines, including:

adhering to quality workplace procedures

assembling machine and preparing for inspection and testing

completing workplace report/forms accurately

dealing with unplanned events in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

dismantling machine and storing parts securely

following winding specifications and/or instructions

preparing stator for winding

selecting correct coils and insulation

winding and connecting stator correctly

using tools safely in accordance with workplace procedures.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

safe working practices and rewinding single phase machines

sustainable energy principles and practices

techniques of winding single phase machines, including:

electrical machine insulation types and applications

coil placement techniques

coil connection arrangements and terminations

winding insulation methods.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Rewinding single phase machines must include the following:

dismantling and winding stators for single phase machines in an environment designed specifically for the purpose