NTISthis.com

Evidence Guide: UEEEL0078 - Install and commission whole current electricity meters

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEEL0078 - Install and commission whole current electricity meters

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install whole current meter

  1. Scope of work activity is confirmed from the work order / instruction, in consultation with supervisor / authorised person
Scope of work activity is confirmed from the work order / instruction, in consultation with supervisor / authorised person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate electricity meter and enclosure are identified and confirmed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Customer is advised of proposed work and scheduling in accordance with job requirements/specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work Health and Safety (WHS) / Occupational Health and Safety (OHS) requirements and relevant workplace procedures including de-energising, isolation and energising are identified and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks assessed, and risk control measures and Safe Work Method Statements (SWMS) applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Switchboard on which the meter is to be installed is inspected and evaluated for compliance with safety and functionality requirements and industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approval to rectify safety and/or functionality defects identified by visual inspection of the switchboard is sought from relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation and any rectification work is planned and sequenced appropriately in consultation with relevant person/s and in accordance legislative framework

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirmation that safe isolation of the installation, access to a communication’s connection and implementation of any relevant safeguards to associated metering services can be completed in accordance with job requirements is obtained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources, materials, tools, equipment and testing devices are obtained and checked for correct operation and safety and against job requirements and specifications in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personal Protective Equipment (PPE) is selected, checked and used accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install whole current electricity meter

  1. Need to test or measure live work is determined in accordance with WHS/OHS requirements, workplace procedures and SWMS
Need to test or measure live work is determined in accordance with WHS/OHS requirements, workplace procedures and SWMS

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre installation tests and assessments are carried out, correct meter to be replaced confirmed and information documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approval to rectify safety and/or functionality defects identified by testing and assessment is sought from relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work activities outside of the limits of own authority and/or qualification are identified, and assistance sought if required in accordance with operating instructions and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Existing meter is isolated by authorised person and checked and tested to confirm ‘deenergised’ in accordance with workplace procedures and WHS/OHS requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved rectification work is carried out to comply with industry standards and in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meter is installed to comply with relevant technical industry standards, job specifications and workplace procedures and requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meter power and communication connections, and where required communications technology device installation, are made in accordance with manufacturer and job specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Meter is configured and functionality confirmed in accordance with manufacturer specifications and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work progress is monitored against the approved pre-start risk assessment (workplan) and adjustments to the plan made, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test procedures are performed to establish and confirm a neutral integrity test point (NITP), integrity of MEN, phase rotation where applicable, and main earth connections in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ongoing checks of the quality of installation are undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation is carried out efficiently without unnecessary waste of materials or damage to apparatus circuits, the surrounding environment or services using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete meter installation activity and report completion of work

  1. WHS/OHS work completion risk control measures and workplace procedures are followed
WHS/OHS work completion risk control measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supply is reinstated 'energised' to the installation in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final inspection and tests are made to ensure the installation conforms to job requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite and tools are cleaned and made safe, and waste disposed of, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Where required, hazardous waste is removed and disposed of in accordance with regulatory requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final visual inspection of installation and work area is performed to ensure the work site is left clean of any hazardous materials or substances in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

‘As-installed' meter or rectification work is documented, and appropriate person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation and certification compliance report/s and other documentation is updated and submitted, as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work supervisor or authorised person/s notified of completion of work and the completion of activity is documented in accordance with the pre-start risk assessment (workplan)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Metering installation work outcomes, configurations and completion of work is communicated to the customer in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge