The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to assess fitness-for-purpose of equipment and systems
|
|
WHS/OHS policies and safe work methods are obtained and reviewed Completed |
Evidence:
|
Equipment or system to be assessed is determined from instructions and in consultation with authority of the owner |
|
Completed |
Evidence:
|
Equipment specification is obtained from site records or equipment/system manufacturer (where available) |
|
Completed |
Evidence:
|
Authenticity of obtained documentation is verified with the issuing organization or the assessor |
|
Completed |
Evidence:
|
Applicable standards and codes of practice the equipment or systems are to be assessed against are obtained and reviewed |
|
Completed |
Evidence:
|
If equipment specification is unavailable, arrangements are made to establish the specification of the equipment to determine the normal operating and explosion-protection performance parameters of the equipment or system |
|
Completed |
Evidence:
|
Tools and certified measuring and testing devices needed to carry out field measurements and testing are obtained and checked for correct operation and safety |
|
Completed |
Evidence:
|
Gather technical information to assess fitness-for- purpose of equipment and systems
|
|
Safe work methods for hazardous areas and assessment tasks are accepted and followed Completed |
Evidence:
|
Measurements and tests are carried out to verify the specification and operating parameters of the equipment or system |
|
Completed |
Evidence:
|
Data relevant to the specification is gathered to assess and verify the equipment or system according to the applicable standards and codes of practice |
|
Completed |
Evidence:
|
Assess equipment/systems against standards
|
|
Equipment or system details are assessed, including measurement, tests, ‘alternative’ tests and calculations and the design specifications, for compliance with each relevant clause in the applicable standard Completed |
Evidence:
|
Differences between the equipment or system assessment and standards requirements are identified and documented |
|
Completed |
Evidence:
|
Recommendations are developed as to whether remedial work is viable for equipment or systems that are not initially assessed as fit-for-purpose |
|
Completed |
Evidence:
|
Specifications are recommended for the remediation of equipment or systems to be suitable as fit-for-purpose |
|
Completed |
Evidence:
|
Develop and submit a fitness-for-purpose report
|
|
Assessment results concerning the integrity of explosion-protected electrical equipment or systems are documented in a fitness-for- purpose report that includes the processes taken and justification for the outcomes Completed |
Evidence:
|
Fitness-for-purpose report and all required appended documentation is forwarded to the person responsible for maintaining compliance records |
|
Completed |
Evidence:
|