Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEHA0021 - Design explosion-protected electrical systems and installations

What evidence can you provide to prove your understanding of each of the following citeria?

Establish the explosion-protection requirements for an electrical system and installation

  1. Explosion- protection requirements for electrical installation for hazardous areas are obtained, interpreted and applied
Explosion- protection requirements for electrical installation for hazardous areas are obtained, interpreted and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazardous area classification drawings, process specifications and plant design documentation are reviewed and the scope of the required electrical installation determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Explosion-protection requirements are determined from reviewing the standards to the installation is required to comply

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Incorporate the explosion-protection requirements in electrical systems and installation design

  1. Consideration is given to locating electrical equipment in non-hazardous areas, where possible
Consideration is given to locating electrical equipment in non-hazardous areas, where possible

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The installation is designed to maximise ease of access for inspection and maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ability to obtain the required degree of operational safety for the installation is incorporated in the design

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The specification for the ratings and characteristics of electrical equipment in the installation are compatible with the explosion-protection requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engineering principles are applied to ensure the parameters for each equipment type, equipment group, equipment temperature class, cables and other factors for correct application are compliant and correctly specified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment is specified for the explosive atmosphere, zone and external influences in the locations where equipment is to be installed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Wiring systems (cables, supports, enclosures) are specified for the atmosphere, zones and external influences along the routes where they are to be installed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document and finalise design

  1. Design is checked for compliance with the requirements established for the electrical system and installation
Design is checked for compliance with the requirements established for the electrical system and installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design is documented to include specification of all explosion-protected equipment and wiring systems, equipment location and cable route drawings and compliance documents for each item of explosion-protected equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design is submitted for appropriate organisational approval and, where applicable, statutory or regulatory approval

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved copies of design documents are included in the verification dossier

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge