The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to repair cable
|
|
Safe work methods to repair cables are obtained from workshops, standards and original manufacturer’s instructions and understood Completed |
Evidence:
|
Knowledge of mining cable types, features, component functions, typical applications and how they are stored is applied to preparing for the work |
|
Completed |
Evidence:
|
Cable to be repaired and instructions on the extent of repairs are received and confirmed with supervising personnel |
|
Completed |
Evidence:
|
Materials required for the repair are obtained and checked against received instructions |
|
Completed |
Evidence:
|
Tools and equipment needed to carry out the cable repair work are obtained and checked for correct operation and safety |
|
Completed |
Evidence:
|
Carry out cable repair
|
|
Safe work methods to carry out cable repair work are accepted and followed Completed |
Evidence:
|
Knowledge of cable repair methods and procedures are applied and instructions for the extent of repair are followed |
|
Completed |
Evidence:
|
Damaged cable material is removed and cables prepared for joining |
|
Completed |
Evidence:
|
An acceptable method is applied to splicing and joining armoring, screens and conductive materials |
|
Completed |
Evidence:
|
Insulation, insulation screening and covering is replaced on all cores and outer sheaths correctly using materials specified in the work instructions |
|
Completed |
Evidence:
|
The correct method is used to join pliable cable armour |
|
Completed |
Evidence:
|
Cable sheath is repaired using the correct sheath tape and vulcanized at the required temperature and timed to ensure as new electrical and mechanical properties are retained |
|
Completed |
Evidence:
|
Cable repair is done in a manner that does not reduce the operating parameters for the cable type |
|
Completed |
Evidence:
|
Safe work methods for ‘house-keeping’ at the completion of cables repair work are followed |
|
Completed |
Evidence:
|
Document cable repair work
|
|
Cable repair work completion sheets are filled out in accordance with quality assurance procedures Completed |
Evidence:
|
Responsible supervisor is notified of the completion of the work in accordance with quality assurance procedures |
|
Completed |
Evidence:
|