NTISthis.com

Evidence Guide: UEEIC0003 - Assist in commissioning process and instrumentation control systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEIC0003 - Assist in commissioning process and instrumentation control systems

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to assist in commissioning process control systems

  1. Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS/OHS risk control measures and workplace procedures are followed in preparation for work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety hazards that have not previously been identified are noted and risk control measures implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commissioning plan is reviewed with relevant team members to ensure commissioning role/s of members are identified and ensure work is coordinated effectively in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measurement parameters are identified with team in accordance with workplace procedures, process requirements and manufacturer instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preparatory work is checked to ensure no damage has occurred and work is in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Need to test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Circuits are checked and isolated in accordance with WHS/OHS requirements and workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assist in commissioning process control systems

  1. WHS/OHS risk control measures and workplace procedures for carrying out work are followed
WHS/OHS risk control measures and workplace procedures for carrying out work are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commissioning testing/measuring devices are connected and set up in accordance with relevant industry standards for control system and work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process instruments and apparatus are set up and adjusted in accordance with relevant industry standards, process control requirements, equipment manufacturer instructions and work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustments are made to provide optimum transmission/reception performance in accordance with relevant industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Decisions for dealing with unplanned situations are made from discussions with relevant person/s and/or job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Methods for dealing with unplanned situations are selected in accordance with WHS/OHS requirements and job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commissioning assistance is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and report commissioning activities

  1. WHS/OHS risk control work completion measures and workplace procedures are followed
WHS/OHS risk control work completion measures and workplace procedures are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is cleaned and made safe in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustment settings are documented and relevant person/s notified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including:

using risk control measures

assisting in commissioning process control systems

carrying out commissioning assistance without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles

checking and isolating circuits

checking preparatory work to ensure no damage has occurred

connecting and setting up commissioning testing/measuring devices in accordance with relevant industry standards for particular control system and work instructions

dealing with unplanned situations with decisions from discussions with relevant person/s and/or job specifications

determining need to test and measure live work

documenting adjustment settings in accordance with workplace procedures

identifying measurement parameters by reviewing process requirements and equipment manufacturer instructions

identifying roles of each commission team member

making adjustments to provide optimum transmission/reception performance

obtaining tools, equipment and testing devices required for work

preparing to assist in commissioning process control systems

setting up and adjusting process instruments and apparatus in accordance with relevant industry standards for process control, equipment manufacturer instructions and work instructions.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

isolation procedures

problem-solving techniques

process instruments and apparatus

relevant commissioning process, including:

commissioning planning and documentation

procedures for commissioning instrumentation

purpose and importance of documentation

purpose of commissioning

relevant industry standards for control system

relevant manufacturer specifications and operating instructions

relevant measurement parameters

relevant job safety assessments or risk mitigation processes

relevant tools, equipment and testing/measuring device

relevant WHS/OHS legislated requirements

relevant workplace documentation, including:

commissioning plan

relevant workplace instructions, policies and procedures

sustainable energy principles.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Process control systems incorporating closed loop control and digital and analogue elements must include at least five of the following:

interacting control functions