The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to diagnose and rectify a.c. motor drive system faults
|
|
WHS/OHS processes and workplace procedures for a given work area are identified, obtained and applied Completed |
Evidence:
|
Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work |
|
Completed |
Evidence:
|
Safety hazards that have not previously been identified are documented on job safety assessments and risk control measures devised and implemented in consultation with relevant person/s |
|
Completed |
Evidence:
|
Scope of fault/s is determined from fault report/s, relevant documentation and in consultation with relevant person/s |
|
Completed |
Evidence:
|
Relevant person/s is consulted to ensure work is coordinated effectively with others involved on the worksite |
|
Completed |
Evidence:
|
Tools, equipment and testing devices needed to diagnose faults are obtained in accordance with workplace procedures and checked for correct operation and safety |
|
Completed |
Evidence:
|
Diagnose and rectify a.c. motor drive system fault/s
|
|
WHS/OHS risk control measures and workplace procedures for carrying out work are followed Completed |
Evidence:
|
Need to inspect, test or measure live work is determined and conducted in accordance with WHS/OHS requirements and workplace procedures, as required |
|
Completed |
Evidence:
|
Circuits/machines/plant are inspected, checked and isolated, as required, in accordance with WHS/OHS requirements and workplace procedures |
|
Completed |
Evidence:
|
Logical diagnostic methods/techniques are applied to diagnose a.c. motor control system faults employing measurements and estimations of system operating parameters referenced to system operational requirements |
|
Completed |
Evidence:
|
Fault scenarios are tested and confirmed as being the source of system problems in accordance with workplace procedures |
|
Completed |
Evidence:
|
Causes of the faults are identified and relevant person/s identified to rectify the fault, as required, outside the scope of the a.c. motor drive control system |
|
Completed |
Evidence:
|
Faults in the control components of the system are rectified in accordance with a.c. motor control system operation standards |
|
Completed |
Evidence:
|
System is inspected and tested to verify that the system operates as intended and to specified requirements |
|
Completed |
Evidence:
|
Decisions for dealing with unplanned situations are determined from discussions with relevant person/s, job specifications and requirements |
|
Completed |
Evidence:
|
Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes |
|
Completed |
Evidence:
|
Diagnosis and rectification activities are carried out efficiently, without unnecessary waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices |
|
Completed |
Evidence:
|
Complete and report fault diagnosis and rectification activities
|
|
WHS/OHS work completion risk control measures and workplace procedures are followed Completed |
Evidence:
|
Worksite is made safe in accordance with workplace safety procedures |
|
Completed |
Evidence:
|
Rectification of faults is documented in accordance with workplace procedures |
|
Completed |
Evidence:
|
Relevant person/s is notified in accordance with workplace procedures that the system faults have been rectified |
|
Completed |
Evidence:
|