Evidence Guide: UEEIC0050 - Plan instrumentation and control projects

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEEIC0050 - Plan instrumentation and control projects

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to plan project

  1. Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Techniques for project planning are reviewed and adopted in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instrumentation and control project is determined from design brief specification and/or relevant documentation and in discussions with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop project plan proposal

  1. Estimated plant, material, labour and relevant costs are sought and obtained from relevant person/s in accordance with workplace procedures
Estimated plant, material, labour and relevant costs are sought and obtained from relevant person/s in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project budget is determined from estimated plant, material, labour and relevant costs in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Critical path analysis is applied to developing workflow strategies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sources and availability of materials and human resources required for project are determined in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risk management strategies are sought and obtained in accordance with project plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project plan is reviewed against inputs and adjusted to rectify any anomalies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project plan proposal is documented in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain approval for project plan

  1. Project plan is presented and discussed with relevant person/s
Project plan is presented and discussed with relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Alterations to the project plan from presentation/discussion are negotiated with relevant person/s in accordance with workplace procedure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final project plan is documented and approval obtained from relevant person/s

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including:

using risk control measures

determining and adopting project planning techniques

developing effective workflow strategies

developing project plan proposal

documenting project plan proposal

establishing a project budget estimating plant, material, labour and related costs

negotiating alterations to proposed project plan

obtaining approval of the final plan

obtaining risk management strategies

preparing to plan project

reviewing project plan against inputs and rectifying any anomalies.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

control system industry sector customs and practices

critical path and project analysis

instrumentation and control project planning

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant plant, material, labour and related costs

relevant WHS/OHS legislated requirements

relevant workplace documentation, including:

design brief specification

project plan proposal

relevant workplace quality, instructions, policies and procedures

risk management strategies.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.