The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to develop and validate basic integrated systems.
|
|
OHS processes and procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
The extent and nature of the integrated system is determined from design brief. Completed |
Evidence:
|
Safety and other regulatory requirements to which the electrical installation shall comply area are identified, obtained and understood. Completed |
Evidence:
|
Work supervisor or customers are consulted to determine which functions of the system are to be use and the parameter of each and written confirmation sought. Completed |
Evidence:
|
Software, tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety. Completed |
Evidence:
|
Develop and validate basic integrated systems.
|
|
Established OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Knowledge of integrated systems, electrical and other services, installation performance standards, compliance methods and service equipment is applied to developing the integrated system. Completed |
Evidence:
|
System installation requirements, equipment and instructions for the integrated system are incorporated in the development. Completed |
Evidence:
|
Safety, functional and budgetary considerations are incorporated in the installation design. Completed |
Evidence:
|
Equipment required for the integrated system is selected and obtained in accordance with the developed plan and established requirements. Completed |
Evidence:
|
The required status of each function of system devices is entered and their parameters set in accordance manufactures programming instructions and customer's requirements. Completed |
Evidence:
|
Location of each device in the installation of the integrated system is documented to ensure correct operation of system functions. Completed |
Evidence:
|
Solutions to unplanned situation are provided consistent with organisation's policy. Completed |
Evidence:
|
Validate integrated system and report.
|
|
System device operations are tested in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
Operating anomalies are identified and corrected in accordance with established routines. Completed |
Evidence:
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Work completion is documented and appropriate person(s) notified in accordance with established routines. Completed |
Evidence:
|