NTISthis.com

Evidence Guide: UEENEEF102A - Install and maintain cabling for multiple access to telecommunication services

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

UEENEEF102A - Install and maintain cabling for multiple access to telecommunication services

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install and maintain cabling.

  1. OHS procedures for a given work area are identified, obtained and understood through established routines and procedures.
  2. Health and safety risks are identified and established risk control measures and procedures are followed in preparation for the work.
  3. Remote power feeding is identified and established risk control measures prepared.
  4. The nature and location of the work is determined from documentation or in discussion with appropriate person(s) to establish the scope of work to be undertaken.
  5. Cable routes are planned within the constraints of the building structure, significants and regulations.
  6. Earthing requirements are determined with consideration of existing earthing arrangements, where applicable and of cable system earth upper and lower resistance limitations.
  7. Advice is sought from appropriate persons to ensure the work is coordinated effectively with others.
  8. Sources of materials that may be required for the work are established in accordance with established routines and procedures.
  9. Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety.
OHS procedures for a given work area are identified, obtained and understood through established routines and procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Health and safety risks are identified and established risk control measures and procedures are followed in preparation for the work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remote power feeding is identified and established risk control measures prepared.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

The nature and location of the work is determined from documentation or in discussion with appropriate person(s) to establish the scope of work to be undertaken.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable routes are planned within the constraints of the building structure, significants and regulations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Earthing requirements are determined with consideration of existing earthing arrangements, where applicable and of cable system earth upper and lower resistance limitations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advice is sought from appropriate persons to ensure the work is coordinated effectively with others.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sources of materials that may be required for the work are established in accordance with established routines and procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and maintain cabling.

  1. Established OHS risk control measures and procedures for carrying out the work are followed.
  2. Installed support structure is checked to ensure cable will not be exposed to damage during installation and general operation.
  3. Catenary supports are secured to building structure and tensioned where necessary to ensure cable weight can be carried in operating conditions with interference and safety segregation maintained including adherence to AS/ACIF S009.
  4. Protective earthing of metal work is installed in accordance with requirements and to industry standards.
  5. Cables/wires are handled in accordance with manufacturer's application specifications including tension and bending stress requirements.
  6. Sufficient excess is allowed at cable ends to facilitate termination.
  7. Telecommunication outlet ends of cable are uniquely labelled to match identifier at originating location.
  8. Cable is placed and secured to maintain safety and interference segregation in accordance with legislative and industry standards.
  9. Cable ties not tightened to the point of causing cable sheath damage or transmission impairment are trimmed flush to prevent risk of personal damage.
  10. Cables installed as catenaries or supported by catenaries in external environment shall meet minimum above ground clearances and clearances from hazardous electrical services as per AS/ACIF S009.
  11. Cables installed underground shall meet minimum depth of cover and segregation from hazardous electrical and other services as per AS/ACIF S009.
  12. Over-voltage protection devices are fitted to all cable pairs, where required, to suppress voltage surges with the devices protectively earthed in accordance with AS/ACIF S009.
  13. TRC/CES/Earth wire insulation is protected against damage and TRC/CES and protective earths segregated in accordance with relevant industry and legislative standards AS/ACIF S009.
  14. Procedures for referring non-routine events to immediate supervisor for directions are followed.
  15. Cabling is installed efficiently without waste of materials and energy or damage to apparatus, the surrounding environment or services.
  16. Routine quality checks are carried out to ensure cabling complies with requirements.
Established OHS risk control measures and procedures for carrying out the work are followed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installed support structure is checked to ensure cable will not be exposed to damage during installation and general operation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Catenary supports are secured to building structure and tensioned where necessary to ensure cable weight can be carried in operating conditions with interference and safety segregation maintained including adherence to AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protective earthing of metal work is installed in accordance with requirements and to industry standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables/wires are handled in accordance with manufacturer's application specifications including tension and bending stress requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sufficient excess is allowed at cable ends to facilitate termination.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Telecommunication outlet ends of cable are uniquely labelled to match identifier at originating location.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable is placed and secured to maintain safety and interference segregation in accordance with legislative and industry standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable ties not tightened to the point of causing cable sheath damage or transmission impairment are trimmed flush to prevent risk of personal damage.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables installed as catenaries or supported by catenaries in external environment shall meet minimum above ground clearances and clearances from hazardous electrical services as per AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cables installed underground shall meet minimum depth of cover and segregation from hazardous electrical and other services as per AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Over-voltage protection devices are fitted to all cable pairs, where required, to suppress voltage surges with the devices protectively earthed in accordance with AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

TRC/CES/Earth wire insulation is protected against damage and TRC/CES and protective earths segregated in accordance with relevant industry and legislative standards AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for referring non-routine events to immediate supervisor for directions are followed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cabling is installed efficiently without waste of materials and energy or damage to apparatus, the surrounding environment or services.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine quality checks are carried out to ensure cabling complies with requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminate and test cables and earth wires.

  1. Established OHS risk control measures and procedures for carrying out the work are followed.
  2. Cable sheath removed to allow for correct termination length and without damage to underlying conductors and their insulation.
  3. Terminating modules are installed in accordance to manufacturer specifications and cable pairs neatly and sequentially fanned for termination.
  4. Conductors are terminated in accordance with recommended colour code sequence using appropriate termination tools in the manufacturer's specified manner.
  5. Cable shield (if applicable) is earthed to manufacturer specifications and relevant industry codes of practice including AS/ACIF S009.
  6. Visual inspection is undertaken to confirm termination colour code sequence has been followed prior to end-to-end testing of wire and pair termination integrity.
  7. Cable pairs are tested and clearly labelled to provide an accurate identification in accordance with requirements.
  8. TRC/CES/Earth wires are terminated with connectors recommended by manufacturers in accordance with relevant industry codes of practice including AS/ACIF S009.
  9. TRC/CES /Earth wire continuity is maintained through out and interface requirements with electrical systems are observed.
  10. TRC/CES /Earthing installation is tested for continuity, insulation resistance and conductive resistance as per relevant industry standards including AS/ACIF S009.
  11. Earthing system is labelled in accordance with requirements.
  12. Compatibility of alterations with existing systems is confirmed and new work tested both in isolation and when integrated with existing systems.
  13. Procedures for referring non-routine events to immediate supervisor for directions are followed.
  14. Cabling is terminated efficiently without waste of materials and energy or damage to apparatus, the surrounding environment or services.
  15. Routine quality checks are carried out and a defect rectified to ensure cabling complies with requirements.
Established OHS risk control measures and procedures for carrying out the work are followed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable sheath removed to allow for correct termination length and without damage to underlying conductors and their insulation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Terminating modules are installed in accordance to manufacturer specifications and cable pairs neatly and sequentially fanned for termination.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conductors are terminated in accordance with recommended colour code sequence using appropriate termination tools in the manufacturer's specified manner.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable shield (if applicable) is earthed to manufacturer specifications and relevant industry codes of practice including AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Visual inspection is undertaken to confirm termination colour code sequence has been followed prior to end-to-end testing of wire and pair termination integrity.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable pairs are tested and clearly labelled to provide an accurate identification in accordance with requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

TRC/CES/Earth wires are terminated with connectors recommended by manufacturers in accordance with relevant industry codes of practice including AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

TRC/CES /Earth wire continuity is maintained through out and interface requirements with electrical systems are observed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

TRC/CES /Earthing installation is tested for continuity, insulation resistance and conductive resistance as per relevant industry standards including AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Earthing system is labelled in accordance with requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compatibility of alterations with existing systems is confirmed and new work tested both in isolation and when integrated with existing systems.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures for referring non-routine events to immediate supervisor for directions are followed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cabling is terminated efficiently without waste of materials and energy or damage to apparatus, the surrounding environment or services.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Routine quality checks are carried out and a defect rectified to ensure cabling complies with requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete cabling work, records and reporting.

  1. OHS work completion risk control measures and procedures are followed.
  2. Work site is cleaned and made safe in accordance with established procedures.
  3. Record sheets and plans of cable location, type and infrastructure are accurately created or updated and stored in accordance with customer requirements.
  4. Cable pair record books are created or updated to provide an accurate record of pair locations, inter-connections and usage in accordance with industry codes of practice and AS/ACIF S009.
  5. Cabling completion advice is documented and reported in accordance with requirements.
OHS work completion risk control measures and procedures are followed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is cleaned and made safe in accordance with established procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record sheets and plans of cable location, type and infrastructure are accurately created or updated and stored in accordance with customer requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cable pair record books are created or updated to provide an accurate record of pair locations, inter-connections and usage in accordance with industry codes of practice and AS/ACIF S009.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cabling completion advice is documented and reported in accordance with requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

9) This provides essential advice for assessment of the unit and must be read in conjunction with the performance criteria and the range statement of the unit and the Training Package Assessment Guidelines.

The Evidence Guide forms an integral part of this unit. It must be used in conjunction with all parts of the unit and performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment

9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the industry-preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accordance with industry and regulatory policy.

Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.

The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Sources of evidence need to be ‘rich’ in nature to minimise error in judgment.

Activities associated with normal everyday work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit

9.2)

Before the critical aspects of evidence are considered all prerequisites shall be met.

Evidence for competence in this unit shall be considered holistically. Each element and associated performance criteria shall be demonstrated on at least two occasions in accordance with the ‘Assessment Guidelines – UEE11 ’. Evidence shall also comprise:

A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices, including the use of risk control measures as specified in the performance criteria and range statement

Apply sustainable energy principles and practices as specified in the performance criteria and range statement

Demonstrate an understanding of the essential knowledge and associated skills as described in this unit. It may be required by some jurisdictions that RTOs provide a percentile graded result for the purpose of regulatory or licensing requirements.

Demonstrate an appropriate level of skills enabling employment

Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures

Demonstrated consistent performance across a representative range of contexts from the prescribed items below:

Lay and connect cables for multiple access to telecommunication services as described in 8) and including:

A

Terminating systems at both distributor and outlet locations and at least one 50 pair copper cable, with accurate completion of installation records, drawing alterations and compliance forms

B

Placing of cables on support structures and building faces for both internal and external locations

C

Securing cables correctly for above locations

D

Avoiding cable damage such as crushing, burning, kinking, sheath twist, cutting and nicking, bending radius

E

Reading and interpreting drawings related to cable layouts, outlet location, cable coding system and identifiers, distributor locations

F

Conducting and interpreting cable test results

G

Correctly interpreting and applying standards and regulations

H

Completing the required documentation

I

Dealing with unplanned events by drawing on essential knowledge and skills to provide appropriate solutions incorporated in a holistic assessment with the above listed items

Context of and specific resources for assessment

9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:

OHS policy and work procedures and instructions.

Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.

These should be used in the formal learning/assessment environment.

Note:

Where simulation is considered a suitable strategy for assessment, conditions must be authentic and as far as possible reproduce and replicate the workplace and be consistent with the approved industry simulation policy.

The resources used for assessment should reflect current industry practices in relation to laying and connecting cables for multiple access to telecommunication services.

Method of assessment

9.4)

This unit shall be assessed by methods given in Volume 1, Part 3 ‘Assessment Guidelines’.

Note:

Competent performance with inherent safe working practices is expected in the Industry to which this competency standard unit applies. This requires assessment in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units

9.5)

For optimisation of training and assessment effort, competency development in this unit may be arranged concurrently with unit:

UEENEEE105A

Fix and secure electrotechnology equipment

UEENEEE107A

Use drawings, diagrams, schedules, standards, codes and specifications

Required Skills and Knowledge

8) This describes the essential skills and knowledge and their level, required for this unit.

Evidence shall show that knowledge has been acquired of safe working practices and laying and connecting cables for multiple access to telecommunication services.

All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies.

KS01-EF102A Telecommunications telephony and switching

Evidence shall show an understanding of telecommunications telephony and switching, applying safe working practices and relevant Standards, Codes and Regulations to an extent indicated by the following aspects:

T1. Principles and characteristics of sound encompassing:

Sound characteristics

Sound waves

Distortion

Attenuation

Resonant frequency

Sound pressure levels

T2. Transmission of sound encompassing:

Compression

Rarefaction

Sound transmission

Wavelength

Inverse square rule (attenuation)

Basic telephone construction

T3. Telephone transmitters encompassing:

Telephone transmitter functions

Telephone transmitter types

Capacitive transmitters

Moving coil transmitters

T4. Telephone receivers encompassing:

Telephone receiver functions

Telephone receiver types

T5. Telephone circuits encompassing:

Components

Operation of basic telephone

Operation of basic facsimile machine

Cables used, colour and termination types

T6. Overview of earthing and protection encompassing:

Function of earthing

Earthing requirements

T7. Customer switching systems (CSS), interfaces and devices encompassing:

System Distribution Frames (SDF)

Power fail and line interface requirements (e.g. Indial, ISDN, Rotary Groups, Extension, Tie-line circuits and the like)

T8. Installation of CSS encompassing:

Documentation

CPR rules

CSS interfaces

CPR rules for SDFs

T9. Installation and termination requirements overview encompassing:

ACMA regulations and requirements

Technical standards

Programming of CSS

Metering and Public/Pay Phones

T10. Hazards encompassing:

Electronic components and circuits

Printed circuit boards

Physical

Static discharge

Chemical

KS02-EF102A Telecommunications Open CPR regulations

Evidence shall show an understanding of telecommunications Open CPR regulations, applying safe working practices and relevant Standards, Codes and Regulations to an extent indicated by the following aspects:

T1 Cabling provider rules encompassing:

Cabling registrars, auditors and inspectors

Mandatory and voluntary requirements for cabling work

Registration

T2 General installation requirements encompassing:

Cabling provider rules requirements

Earth potential rise

Catenary cabling systems

Optical fibre and coaxial cabling systems

Conduits

Surge suppression devices

T3 Cable distribution devices encompassing:

Cable distribution devices

Clearances

General requirement

T4 Indoor cabling encompassing:

General requirements for indoor cabling

Required minimum clearances

Damp situations

Cables in lift and hoist shafts

T5 Underground cabling encompassing:

Requirements for underground cabling

Protection of underground cabling

Segregation from other services

T6 Aerial cabling encompassing:

Requirements for aerial cabling

Minimum clearances

Segregation requirements

T7 Earthing encompassing:

Earthing systems

Earthing of equipment

Equipotential bonding

T8 Miscellaneous regulations encompassing:

Cabling in heritage buildings

Cabling in public places

Cabling in hazardous areas

KS03-EF102A Telecommunications installation practices

Evidence shall show an understanding of telecommunications installation and maintenance practices, applying safe working practices and relevant Standards, Codes and Regulations to an extent indicated by the following aspects:

T1 Telecommunication cable types encompassing:

Construction

Characteristics

Applications

T2 Cable identification encompassing:

Plans and drawing

Labelling

Documentation

T3 Building structures, materials and sequencing encompassing:

Building types

Timber frame

Brick veneer

Double brick

Metal frame

Parts of a building

Sequence of construction

Stages of construction where electrical work is completed

Environmental and heritage awareness purpose and regulations

T4 Cable installation encompassing:

Hazards

Cable damage prevention

Cable dispensers

Cable enclosures

Types

Fixing

Regulations

Distribution boxes and back mounts

Systems

T5 Termination Boundaries and devices encompassing:

Electrical connections

Hazards

Regulations

T6 Cable preparation and terminations and hauling mechanisms encompassing:

Indoor Methods

Outdoor Methods

T7 Earthing concepts encompassing:

MEN System

Communication Earthing System

Telecommunication Reference Conductor

Earthing Cable Shield

Testing

Earth Barriers

Purpose of earth testing instruments

Earth Potential Rise

Earthing test procedures

Interpretation of results

T8 Surge suppression and system encompassing:

Purpose

Types

Operation

Installation Techniques

Earthing requirements

T9 Cable shielding and interference encompassing:

EMI/RFI Principles

Sources

Reduction Techniques

Earthing Cable Shields

T10 Telecommunication earthing systems encompassing:

Hazards

Solutions

Installation

Termination

Line taps

Testing

Range Statement

10) This relates to the unit as a whole providing the range of contexts and conditions to which the performance criteria apply. It allows for different work environments and situations that will affect performance.

This unit shall be demonstrated in relation to cable laying and connecting applicable to larger commercial and industry installations involving many lines, multi-pair cables, backbone cabling, multi-story buildings and more complicated termination modules and distributors.

Generic terms used throughout this Vocational Standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms that apply are given in Volume 2, Part 2.1.