The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to plan switchboard and control panel layouts.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
The extent and nature of the switchboard and control panel layouts is determined from job specifications or design brief. Completed |
Evidence:
|
Safety and other regulatory requirements to which the switchboard and control panel layouts shall comply are identified, obtained and understood. Completed |
Evidence:
|
Equipment to be incorporated in the switchboard or control panel is determined from job specifications or design brief. Completed |
Evidence:
|
Plan switchboard and control panel layouts.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Equipment is selected that complies with technical standards and job specifications and requirements. Completed |
Evidence:
|
Switchboard and control panel layouts are planned to accommodate all necessary equipment with sufficient clearance to enable wiring/connecting and servicing with constraints imposed by job specifications. Completed |
Evidence:
|
Switchboard and control panel layouts are planned to comply with safety regulatory and functional requirements. Completed |
Evidence:
|
Switchboard and control panel layout draft is checked for compliance with the design brief and regulatory requirements. Completed |
Evidence:
|
Switchboard and control panel layout is documented for submission to appropriate person(s) for acceptance and approval. Completed |
Evidence:
|
Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes. Completed |
Evidence:
|
Obtain approval for switchboard and control panel layouts.
|
|
Requests for alterations to the layout are negotiated with relevant person(s) within the constraints of organisation’s policy. Completed |
Evidence:
|
Final layout design is documented and approval obtained from appropriate person(s). Completed |
Evidence:
|
Switchboard and control panel layout documentation is forwarded to appropriate production personnel. Completed |
Evidence:
|
Quality of work is monitored against established organisational standards Completed |
Evidence:
|