The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for overhaul/repair of switchgear/control gear.
|
|
OHS processes and procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Established OHS risk control measures and procedures in preparation for the work are followed. Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted and established risk control measures are implemented. Completed |
Evidence:
|
Instructions on the extent of overhaul and/or repair are received and expected outcomes of the work acquired with appropriate personnel. Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site. Completed |
Evidence:
|
Switchgear/control gear service and repair documentation is read and understood. Completed |
Evidence:
|
Sources of materials that may be required for the work are established in accordance with established procedures. Completed |
Evidence:
|
Tools, equipment and testing devices needed to work are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Overhaul switchgear/control gear.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures. Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
Switchgear and control gear is dismantled and parts tagged and stored to prevent loss or damage. Completed |
Evidence:
|
The state of switchgear/control gear components is determined by measurements, tests and inspections and results recorded. Completed |
Evidence:
|
Materials/replacement parts required to complete the work are sourced and obtained in accordance with established procedures. Completed |
Evidence:
|
Effectiveness of the repairs is tested in accordance with established procedures. Completed |
Evidence:
|
Specifications and instructions for the overhaul/repair work are documented in accordance with requirements. Completed |
Evidence:
|
Document overhaul/repair work.
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Reusable, faulty or worn components are tagged and dispatched for repair to maintain adequate spares. Completed |
Evidence:
|
Overhaul/repair work is documented in accordance with requirements stating that the switchgear/control gear complies with the overhaul specifications. Completed |
Evidence:
|