The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to conduct electrical tests on three phase induction machines.
|
|
OHS procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Established OHS risk control measures for work preparation are followed. Completed |
Evidence:
|
The extent of the work is determined from job sheets, specifications and regulatory requirements. Completed |
Evidence:
|
Advice is sought from the work supervisor to ensure the work is coordinated effectively with others. Completed |
Evidence:
|
Winding data is obtained from winding data records or directly from measurements of stator and recorded in accordance with established procedures. Completed |
Evidence:
|
Winding is stripped from stator in accordance with established procedures. Completed |
Evidence:
|
Materials required for the work are obtained in accordance with established procedures. Completed |
Evidence:
|
Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety. Completed |
Evidence:
|
Conduct electrical tests on three phase induction machines.
|
|
Established OHS risk control work measures are followed. Completed |
Evidence:
|
Machines/equipment are checked as being isolated where necessary in strict accordance OHS requirements and procedures. (See Note 1) Completed |
Evidence:
|
All necessary HV electrical tests are conducted to established cause of faults or operational condition of the machine. Completed |
Evidence:
|
Status of the machine is determined from test results and recorded. Completed |
Evidence:
|
Prescribed solutions are used to resolve work completion issues. Completed |
Evidence:
|
Routine quality checks are conducted to ensure coils are correctly wound with correct wire, number of turns and shape. Completed |
Evidence:
|
Work is completed in acceptable timeframe given environment and workplace conditions. Completed |
Evidence:
|
Complete work report.
|
|
OHS measures work completion risk controls are followed. Completed |
Evidence:
|
The status of the machine is documented in accordance with established procedures and appropriate person(s) notified. Completed |
Evidence:
|