The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to implement connection/termination processes that include components, conductors, wiring and cables for electronic circuits.
|
|
OHS procedures for a given work area are identified, obtained and understood through established routines and procedures. Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards, which have not previously been identified, are reported and advise on risk control measures, are sought from the work supervisor. Completed |
Evidence:
|
The scope and nature of work to be undertaken is determined from documentation and instructions from work supervisor. Completed |
Evidence:
|
An implementation and work plan is developed to ensure the work is co-ordinated effectively with others. Completed |
Evidence:
|
Materials required for the work are obtained in accordance with established routines and procedures. Completed |
Evidence:
|
Tools, equipment, measuring and termination and connection devices needed to carry out the work are obtained and checked for correct operation and safety. Completed |
Evidence:
|
Connect/terminate components, conductors, wiring and cables.
|
|
Established OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Components and connection/termination methods and devices are selected in accordance with their specified type and rating. (See Note 1) Completed |
Evidence:
|
Components and conductors are placed in accordance with specification/drawing and correct polarity. Completed |
Evidence:
|
Terminations and connections are prepared in accordance to ensure reliability of connections in accordance with industry standards. (See Note 2) Completed |
Evidence:
|
Termination and connections are made using devices and techniques that comply with manufacturer's requirements and industry standards. Completed |
Evidence:
|
Procedures for identifying and responding to non-routine events including defects are coordinated and actioned in accordance with established procedures. Completed |
Evidence:
|
Connection/termination activities are carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Evaluate completed connections and terminations of components, conductors, wiring and cables.
|
|
Established OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Defects in component placement, connections and terminations are identified by visual inspection and recorded. Completed |
Evidence:
|
Solutions to non-compliant work are developed and responded to in accordance with established procedures and requirements Completed |
Evidence:
|
Connections and terminations are performance tested for compliance with the specified Standard and non-compliance performance characteristics identified and recorded. Completed |
Evidence:
|
Rework is carried out to rectify defects and non-compliant performance characteristics to manufacturer's requirements and industry standards. (See Note 3) Completed |
Evidence:
|
Connections and terminations are confirmed compliant with established procedures and requirements Completed |
Evidence:
|
Complete and document connections and terminations activities.
|
|
OHS risk control work completion measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Evaluation documentation confirming compliance of the connections and terminations is verified in accordance with established procedures and requirements Completed |
Evidence:
|
Inspection, testing, and rectification work is documented in accordance with established procedures. Completed |
Evidence:
|
Notes.1. Connections methods include crimping, soldering and use of vendor specific devices.2. Preparation includes sheath and insulation stripping and approved cleaning methods.3. Rework may include the application of desoldering techniques |
|
Completed |
Evidence:
|