The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to inspect and test a instrumentation and control installations
|
|
OHS measures for the site are identified, obtained and understood Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards which have not previously been identified are noted, and established risk control measures are implemented. Completed |
Evidence:
|
Documentation or deemed to comply standard on which installation is based is reviewed and understood. Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site Completed |
Evidence:
|
Tools, equipment and testing devices needed to verify compliance are obtained in accordance with established procedures and checked for correct operation and safety Completed |
Evidence:
|
Preparatory work is checked to ensure no damage has occurred and that work complies with requirements Completed |
Evidence:
|
Visually inspect the installation.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures. Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
Instrument cabling and tubing is checked for suitability for the environments in which they are installed and suitably protected from damage. Completed |
Evidence:
|
The type and configuration/sizing of instrument cabling and tubing is confirmed as meeting that specified for the installation. Completed |
Evidence:
|
Evidence that control apparatus complies with safety and installation requirements is cited. Completed |
Evidence:
|
Marking of control apparatus is checked for accuracy and clarity and compliance with requirements. Completed |
Evidence:
|
Conduct functional and safety testing.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
Where process control apparatus operates at low voltage arrangements are made for an authorised person to conduct and report on all required electrical safety tests. Completed |
Evidence:
|
Insulation and continuity tests are conducted on process control cabling operating at extra-low voltage. Completed |
Evidence:
|
Process control tubing/piping is pressure tested in accordance with established practice. Completed |
Evidence:
|
Functional and test are checks are conducted on all process control apparatus in accordance with established practice. Completed |
Evidence:
|
Report inspection and test findings
|
|
OHS risk control work completion measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Non-compliance defects are identified and reported in accordance with established procedures. Completed |
Evidence:
|
Recommendations for rectifying defects are made in accordance with established procedures. Completed |
Evidence:
|
Verification documentation is completed in accordance with established procedures. Completed |
Evidence:
|