The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to assist in commissioning process control systems
|
|
OHS procedures for a given work area are identified, obtained and understood Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted, and established risk control measures are implemented. Completed |
Evidence:
|
Commissioning plan is review with other team members to ensure commissioning procedures and the role of each member is understood and to ensure the work is coordinated effectively. Completed |
Evidence:
|
Measurement parameters are identified with the team by reviewing process requirements and equipment manufacturer instructions. Completed |
Evidence:
|
Tools, equipment and testing devices needed for the work are obtained in accordance with established procedures and checked for correct operation and safety Completed |
Evidence:
|
Preparatory work is checked to ensure no damage has occurred and that work complies with requirements Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures Completed |
Evidence:
|
Circuits are checked as being isolated where necessary in strict accordance OHS requirements and procedures Completed |
Evidence:
|
Assist in commissioning process control systems
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Commissioning testing/measuring devices are connected and set up in accordance with requirements for a particular control system and team instructions. Completed |
Evidence:
|
Process instruments and apparatus are set up and adjusted in accordance with process control requirements and equipment manufacturer instructions and team instructions. Completed |
Evidence:
|
Adjustments are made to provide optimum transmission/reception performance within regulatory requirements. Completed |
Evidence:
|
Decisions for dealing with unexpected situations are made from discussions with appropriate persons and from job specifications Completed |
Evidence:
|
Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes. Completed |
Evidence:
|
Commissioning assistance is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy principles. Completed |
Evidence:
|
Completion and report commissioning activities
|
|
OHS risk control work completion measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Adjustment settings are documented and appropriate person(s) notified in accordance with established procedures Completed |
Evidence:
|