The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install pipe work, flow controls and accessories
|
|
OHS procedures for a given work area are identified, obtained and understood Completed |
Evidence:
|
Established OHS risk control measures and procedures in preparation for the work are followed Completed |
Evidence:
|
Safety hazards which have not previously been identified are noted and established risk control measures are implemented Completed |
Evidence:
|
Pipe work, flow control and accessory installation is appropriately sequenced in accordance with job schedule Completed |
Evidence:
|
The nature and location of the work is determined from documentation or appropriate person(s) to establish the scope of work to be undertaken Completed |
Evidence:
|
Pipe work routes are planned within the constraints of the building structure, (heritage) significants, specifications and regulations Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site Completed |
Evidence:
|
Materials needed install pipe work, flow controls and accessories are obtained in accordance with established procedures and checked against job requirements Completed |
Evidence:
|
Tools, equipment and testing devices needed to install the pipe work, flow controls and accessories are obtained in accordance with established procedures and checked for correct operation and safety Completed |
Evidence:
|
Preparatory work is checked to ensure no damage has occurred and complies with requirements Completed |
Evidence:
|
Install pipe work, flow controls and accessories
|
|
OHS risk control measures and procedures for carrying out the work are followed Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OH&S requirements and procedures Completed |
Evidence:
|
Pipework, flow controls and accessories are installed to comply with technical standards and job specifications and requirements with sufficient access to affect connections and maintenance Completed |
Evidence:
|
Pipework, flow controls and accessories are installed straight and square in the required locations and within acceptable tolerances Completed |
Evidence:
|
Refrigerant tubing and fittings are silver brazed with the use of dry nitrogen to prevent contamination Completed |
Evidence:
|
Problematic situations that arise from the installation of the pipe work, flow controls and accessories are dealt with in an appropriate manner. Completed |
Evidence:
|
Ongoing checks of the quality of pipe work, flow controls and accessories are undertaken including pressure testing and repair of leaks in accordance with the relevant technical standards and specifications and established procedures Completed |
Evidence:
|
Checking operation, adjusting settings and replacement of flow controls Completed |
Evidence:
|
Pipe work, flow controls and accessories areinstalled efficiently without waste of materials, damage or contamination to apparatus and the surrounding environment or services and using sustainable energy practices Completed |
Evidence:
|
Completion of pipe work, flow controls and accessories installation.
|
|
OHS risk control measures and procedures at the completion of work are followed Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures Completed |
Evidence:
|
Final check of the installed pipe work is made to verify that it complies to all requirements Completed |
Evidence:
|
'As-installed' pipe work, flow controls and accessories are documented and an appropriate person or persons notified in accordance with established procedures Completed |
Evidence:
|