The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to verify refrigeration and air conditioning installations
|
|
OHS procedures for a given work area are identified, obtained and understood Completed |
Evidence:
|
Established OHS risk control measures and procedures in preparation for the work are followed Completed |
Evidence:
|
Safety hazards which have not previously been identified are noted and established risk control measures are implemented Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site Completed |
Evidence:
|
Location of system components is determined from specifications and diagrams Completed |
Evidence:
|
Inspection and tests are appropriately sequenced in accordance with job schedule Completed |
Evidence:
|
Materials needed for the tests and verification are obtained in accordance with established procedures and checked against job requirements Completed |
Evidence:
|
Tools, equipment and testing devices needed to verify compliance are obtained in accordance with established procedures and checked for correct operation and safety Completed |
Evidence:
|
Visually inspect the installation
|
|
OHS risk control measures and procedures for carrying out the work are followed Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures Completed |
Evidence:
|
Pipe work is checked for appropriate type and size Completed |
Evidence:
|
Pipe work, accessories and components are validated as being suitably located, securely fixed and suitably protected from damage or corrosion Completed |
Evidence:
|
System components and accessories are validated as being appropriately rated per manufacture and design specifications Completed |
Evidence:
|
Evidence that equipment complies with safety and functional requirements is cited Completed |
Evidence:
|
Established methods for dealing with unexpected situations are discussed with appropriate person or persons and documented Completed |
Evidence:
|
Unexpected situations are dealt with safely and with the approval of an authorised person Completed |
Evidence:
|
Inspection is carried out efficiently without waste of materials, damage to, or contamination of apparatus and the surrounding environment or services and using sustainable energy practices Completed |
Evidence:
|
Conduct tests
|
|
OHS risk control measures and procedures for carrying out the work are followed Completed |
Evidence:
|
Testing or measuring on a live and operating system in strict accordance with OHS requirements and within established safety procedures Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated in strict accordance OHS requirements and procedures Completed |
Evidence:
|
Electrical tests are conducted to verify that the electrical circuit within the refrigeration installation are safe and function as intended Completed |
Evidence:
|
Refrigeration tests are conducted to verify that the refrigeration equipment and pipe work within the refrigeration installation is safe and functions as intended Completed |
Evidence:
|
Established methods for dealing with unexpected situations are discussed with appropriate person or persons and documented Completed |
Evidence:
|
Unexpected situations are dealt with safely and with the approval of an authorised person Completed |
Evidence:
|
Testing is carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices Completed |
Evidence:
|
Report inspection and verification findings
|
|
OHS work completion risk control measures and procedures are followed Completed |
Evidence:
|
Work site and equipment is cleaned and made safe in accordance with established procedures Completed |
Evidence:
|
Non-compliance defects are identified and reported in accordance with established procedures Completed |
Evidence:
|
Recommendations for rectifying defects are made in accordance with established procedures Completed |
Evidence:
|
Work completion is documented and an appropriate person or persons notified in accordance with established procedures Completed |
Evidence:
|