The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to commission hydronic systems for refrigeration/air conditioning
|
|
OHS procedures for a given work area are identified, identified, obtained and understood Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted and established risk control measures are implemented. Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site. Completed |
Evidence:
|
System operating parameters are identified by reviewing system specifications and component technical data. Completed |
Evidence:
|
Tools, equipment and testing devices needed for the work are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Preparatory work is checked to ensure no damage has occurred and complies with requirements. Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures. Completed |
Evidence:
|
Circuits are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
Commission hydronic systems for refrigeration/air conditioning.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Testing/measuring devices are connected and set up in accordance with requirements for a particular system. Completed |
Evidence:
|
Measurements and adjustments are made to equipment components and controls to provide optimum system performance in accordance with system specifications and regulatory requirements. Completed |
Evidence:
|
Decisions for dealing with unexpected situations are made from discussions with appropriate persons and job specifications and requirements. Completed |
Evidence:
|
Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes. Completed |
Evidence:
|
Commissioning is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy principles. Completed |
Evidence:
|
Completion and report commissioning activities.
|
|
OHS risk control work completion measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Adjustment settings are documented and an appropriate person or persons notified in accordance with established procedures. Completed |
Evidence:
|