The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to audit HVAC/R control systems
|
|
OHS processes and procedures for a given work area are identified, obtained and understood Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Examination and testing area is checked for safety hazards and risk control measures implemented in strict accordance with safety policy and procedures. Completed |
Evidence:
|
Relevant documentation is obtained and read to determine the performance/certification requirements against which the system is to be assessed. Completed |
Evidence:
|
Note: Examples of documentation are those specifying safety requirements, technical standard and as marketed technical performance, product quality endorsement standards.
|
|
Advice is sought from the work supervisor to ensure the work is coordinated effectively with others. Completed |
Evidence:
|
Tools, testing devices, and materials needed to carry out the work are obtained and checked for correct operation and safety. Completed |
Evidence:
|
Audit HVAC/R control systems for compliance with regulations and standards.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures. Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
In depth knowledge of the performance and energy efficiency requirements of HVAC/R system and assessment methods are applied to the audit process. Completed |
Evidence:
|
Control system examination and tests are set up in accordance with established test methods and procedures for each particular parameter under scrutiny. Completed |
Evidence:
|
Control system examination and tests are carried out methodically and results and comments systematically noted. Completed |
Evidence:
|
Unexpected situations are dealt with safely and with the approval of an authorised person. Completed |
Evidence:
|
Assessment is carried out without damage to systems, circuits, the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Complete auditing work and document results
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Examination and test results are evaluated and non-compliance issues identified. Completed |
Evidence:
|
Examination, test results and comments on non-compliance issues are documented and reported to appropriate person(s) in accordance with established procedures Completed |
Evidence:
|