The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to maintain microbial control of air and water systems.
|
|
OHS procedures for a given work area are identified, identified, obtained and understood Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
Safety hazards which have not previously been identified are noted and established risk control measures are implemented. Completed |
Evidence:
|
The maintenance schedule and process compliance requirements are confirmed and work appropriately sequenced in accordance with established procedures. Completed |
Evidence:
|
Appropriate person(s) are consulted to ensure the work is coordinated effectively with others involved on the work site. Completed |
Evidence:
|
Location equipment to be maintained is determined from maintenance schedule procedures and/or system specifications and diagrams. Completed |
Evidence:
|
Resources needed to conduct the maintenance is obtained in accordance with established procedures and checked against job requirements. Completed |
Evidence:
|
Tools, equipment and testing devices needed to conduct the maintenance are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Maintain microbial control of air and water systems.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
Water samples are taken and tested in accordance with established methods and routines. Completed |
Evidence:
|
Apparatus to be maintained is inspected and evaluated for compliance with requirements in accordance with maintenance schedule. Completed |
Evidence:
|
Non compliant apparatus/components/samples are documented and arrangements made for their rectification in accordance with established procedures. Completed |
Evidence:
|
Established methods for dealing with unexpected situations are discussed with appropriate person or persons and documented. Completed |
Evidence:
|
Ongoing checks of the quality of the maintenance are undertaken in accordance with established procedures. Completed |
Evidence:
|
Maintenance process compliance is performed efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Complete of maintenance processes and documentation.
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Work site and equipment is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Final checks are made to verify that the maintenance complies with requirements. Completed |
Evidence:
|
Maintenance completion is documented and an appropriate person or persons notified in accordance with established procedures and regulations. Completed |
Evidence:
|