The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to install LV wind energy conversion systems.
|
|
OHS procedures for a given work area are obtained and understood. Completed |
Evidence:
|
Health and safety risks are identified and established risk control measures and procedures in preparation for the work are followed. Completed |
Evidence:
|
Safety hazards that have not previously been identified are noted and established risk control measures are implemented. Completed |
Evidence:
|
Installation of the system is prepared in consultation with others affected by the work and sequenced appropriately. Completed |
Evidence:
|
The nature and location of the work is determined from documentation or appropriate person to establish the scope of work to be undertaken. Completed |
Evidence:
|
Sitting limitations and customer system requirements are identified by consultation with the customer. Completed |
Evidence:
|
Suitable system components are specified and selected. Completed |
Evidence:
|
Location of system components is planned within the constraints of the building structure and regulations. Completed |
Evidence:
|
Advice is sought from appropriate persons to ensure the work is co-ordinated effectively with others. Completed |
Evidence:
|
Materials and components needed for the installation work are obtained in accordance with established procedures, pre-assembled where necessary, and checked against job requirements. Completed |
Evidence:
|
Materials and components are prepared for transport to the site and transport is arranged. Completed |
Evidence:
|
Tools, equipment and testing devices needed for the installation work are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Preparatory work is checked to ensure no unnecessary damage has occurred previously and complies with requirements. Completed |
Evidence:
|
Install LV wind energy conversion systems.
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Equipment is transported safely to the site. Completed |
Evidence:
|
The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures. Completed |
Evidence:
|
Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures. Completed |
Evidence:
|
System components are installed to comply with technical standards and job specifications and requirements with sufficient access to affect terminations, adjustment and maintenance. Completed |
Evidence:
|
Wiring is terminated at components and associated equipment in accordance with manufacture’s specifications and functional and regulatory requirements. Completed |
Evidence:
|
Established methods for dealing with unexpected situations are discussed with appropriate person or persons and documented. Completed |
Evidence:
|
Unexpected situations are dealt with safely and with the approval of an authorised person. Completed |
Evidence:
|
On-going checks of the quality of installed apparatus are undertaken in accordance with established procedures. Completed |
Evidence:
|
System installation is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits, the surrounding environment or services and using sustainable energy principles. Completed |
Evidence:
|
Complete installation and report installation activities.
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Work site is cleaned and made safe in accordance with established procedures. Completed |
Evidence:
|
Final checks are made to that the installed apparatus conforms to requirements. Completed |
Evidence:
|
System operation is tested and installation verified to be compliant with standards and work specifications. Completed |
Evidence:
|
‘As-installed’ apparatus and associated equipment is documented and an appropriate person or persons notified in accordance with established procedures. Completed |
Evidence:
|
Customer is informed of the system operation, routine maintenance and limitations. Completed |
Evidence:
|
Appropriate documentation as required by standards or job specifications is provided to the customer. Completed |
Evidence:
|