The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to assess fitness-for-purpose of equipment and systems
|
|
OHS policies and procedures are followed. Completed |
Evidence:
|
Equipment or system to be assessed is ascertained from instructions and in consultation with appropriate personnel. Completed |
Evidence:
|
Available design documentation in accordance with established procedures is obtained from site records or equipment/system manufacturer. Completed |
Evidence:
|
Authenticity of documentation is verified with the issuing organization or the assessor. Completed |
Evidence:
|
Appropriate Standards and codes of practice against which equipment or systems are to be assessed are determined, obtained and understood. Completed |
Evidence:
|
Where design documentation is unavailable arrangements are made to establish the specification of the equipment to determine the normal operating and performance parameters of the equipment or system. Completed |
Evidence:
|
Special tools, equipment and testing devices needed to carry out field testing/measurements are obtained and checked for correct operation and safety. Completed |
Evidence:
|
Gather technical information to assess fitness-for-purpose of equipment and systems
|
|
OHS policies and procedures for working in a hazardous area are followed. Completed |
Evidence:
|
Where necessary tests/measurements are carried out to verify the specification for the equipment or system. Completed |
Evidence:
|
Assessment of the equipment or system is made to gather data relevant to the specification and verified according to the appropriate Standards and Codes of Practice. Completed |
Evidence:
|
Assess equipment/systems against Standards
|
|
Equipment/system design details are assessed for compliance with each relevant clause in the appropriate Standard. Examination is set up in accordance with established procedures. Completed |
Evidence:
|
Differences between the equipment and Standards requirements are identified and documented. Completed |
Evidence:
|
Recommendations are developed as to whether remedial work is viable for equipment or systems that are not initially assessed as fit-for-purpose. Completed |
Evidence:
|
Specifications are recommended for the remediation of equipment or systems to be suitable as fit-for-purpose are developed. Completed |
Evidence:
|
Develop and submit a fitness-for-purpose report
|
|
Assessment results pertaining to the integrity of explosion-protected electrical equipment are documented in a fitness-for-purpose report in accordance with requirements and established procedures. Completed |
Evidence:
|
Fitness-for-purpose report and all required appended documentation are forwarded in accordance with requirements and established procedures. Completed |
Evidence:
|