The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to inspect and test cables and lines
|
|
OHS procedures for a given work area are identified, obtained and understood. Completed |
Evidence:
|
Established OHS risk control measures and procedures are followed in preparation for the work. Completed |
Evidence:
|
The extent of inspection and testing is determined from job specifications, drawings and regulatory requirements Completed |
Evidence:
|
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site Completed |
Evidence:
|
Materials needed for inspection and testing are obtained in accordance with established procedures and checked against job requirements Completed |
Evidence:
|
Tools, equipment and testing devices needed to inspect and test are obtained in accordance with established procedures and checked for correct operation and safety. Completed |
Evidence:
|
Inspect and test cables and line
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Installed cable/line are inspected to ensure installation and cable conforms to organization and technical specifications for cable laying. Completed |
Evidence:
|
Cable/line route specification and technical data is reviewed to ensure specified cables have been laid. Completed |
Evidence:
|
Cable/line is tested to ensure continuity or circuit in accordance with technical requirements and /or specifications. Completed |
Evidence:
|
Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes. Completed |
Evidence:
|
Inspection and testing is carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Rectify faults and defects
|
|
OHS risk control measures and procedures for carrying out the work are followed. Completed |
Evidence:
|
Isolated cable/line faults are rectified in accordance with organization procedures and technical instructions to ensure cable/line route technical specifications are met Completed |
Evidence:
|
Defects in cable/line installation are rectified where necessary to ensure all aspects of cable/line route conforms to specifications including conduit, clamps and other securing devices Completed |
Evidence:
|
Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes. Completed |
Evidence:
|
Faults and defects are rectified efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices. Completed |
Evidence:
|
Certify cable and line integrity and report
|
|
OHS work completion risk control measures and procedures are followed. Completed |
Evidence:
|
Faults and defects are documented and corresponding faults or defects. Detailed corrective action is recorded for subsequent engineering review Completed |
Evidence:
|
All test results are documented and test compliance results are recorded for commissioning purposes Completed |
Evidence:
|
Cable/line installation documentation required for commissioning is prepared for handover to engineers for commissioning Completed |
Evidence:
|